Skip to main content

Plans moving forward for key Turkish highway

Plans are moving forward in Turkey for the construction of a new highway project. Mott MacDonald has been named lenders’ technical advisor by the IC Ictas-Astaldi (ICA) consortium for a 60km section of the Northern Marmara highway. This deal is significant and the stretch forms the first of a number of phases of the highway. The project is being delivered under a 10 year, US$2.5 billion public-private partnership (PPP).
October 11, 2013 Read time: 2 mins
Istanbul is on record as one of the world's most traffic-congested cities
Plans are moving forward in Turkey for the construction of a new highway project. 2579 Mott MacDonald has been named lenders’ technical advisor by the IC Ictas-Astaldi (ICA) consortium for a 60km section of the Northern Marmara highway. This deal is significant and the stretch forms the first of a number of phases of the highway. The project is being delivered under a 10 year, US$2.5 billion public-private partnership (PPP).
 
The project involves the design, construction, maintenance and operation of the 60km dual four lane Northern Marmara highway between Odayeri and Paşaköy. It includes construction of 55km of connecting roads, 19 motorway junctions, 67 viaducts, and seven tunnels and a road/rail stay cable stiffened suspension bridge across the Bosphorus. The new bridge, designed by Michel Virlogeux and Swiss consultant T-Engineering, will be a combined road and rail suspension with a main span of 1.4km. It will be the first long span bridge to accommodate an eight lane highway and a two line railway on the same level, giving it a width of 59m. The structure will also have the world’s tallest towers, at over 320m.
 
Mott MacDonald will carry out a technical due diligence review of the project documentation produced by concession company ICA up to financial close. This will include a review of the transaction documents, design, construction methodology, operation and maintenance proposals, budget, programme, payment mechanism and risk analysis. Following financial close, Mott MacDonald will undertake construction and operations monitoring on behalf of lenders.
 
The new east-west route should alleviate congestion on existing routes across Istanbul, including the two existing bridges across the Bosphorus.

For more information on companies in this article

Related Content

  • Asphalt plant for Turkish highway project
    June 27, 2018
    An asphalt plant from Ammann is playing a key role in the construction of a new Turkish highway. An important factor in the selection of the plant for the construction of Turkey’s Northern Marmara Motorway was its ability to utilise fibres. A large portion of the motorway, which serves as a bypass of Istanbul, has been completed. Handling a good deal of the remaining work is Nalbantolu naat, a family-owned business founded in 1995. The company has completed a number of high-profile projects, including
  • Canadian PM Trudeau warned of costs rises for Gordie Howe Bridge
    January 11, 2016
    A devaluing Canadian dollar has pushed up the cost for building a signature Windsor-Detroit bridge by around US$2.5 billion, according to Canadian media reports. The increase more than doubles what was believed needed by the Canadian government to construct the Gordie Howe Bridge, named after a Canadian ice hockey player who played most of his career for the Detroit Red Wings. The toll bridge, to be built under a public private partnership, will link the US city of Detroit, in the state of Michigan, w
  • Montreal’s Champlain Bridge superstructure deal signed with Canam-Bridge
    May 22, 2015
    Canada-based Canam-Bridge has been chosen to fabricate the superstructure for the Champlain bridge project in Montreal as well as to supply steel. Marc Dutil, chief executive of Canam, a specialist bridge superstructure fabricator, expects at least 45,000tonnes of steel will be required for the 3.4km bridge that will span the St. Lawrence River which leads to the Great Lakes of North America. The contract is expected to be completed after a formal deal is reached between the SNC-Lavalin consortium con
  • Key highway project for Qatar
    April 3, 2014
    Design and construction work is commencing on a 47km highway project in Qatar. The design and construction portions of the US$1.17 billion project will be handled by Qatar bin Oman Trading and Contracting (Qatar bin Omran) and QDVC. The 47km highway project includes the construction of a 320m cut-and-cover tunnel, 17 bridges and underpasses as well as six viaducts. The project forms the second phase of Qatar’s 200km New Orbital Highway. The work is expected to take 36 months to complete and construction act