Skip to main content

Plans moving forward for key Turkish highway

Plans are moving forward in Turkey for the construction of a new highway project. Mott MacDonald has been named lenders’ technical advisor by the IC Ictas-Astaldi (ICA) consortium for a 60km section of the Northern Marmara highway. This deal is significant and the stretch forms the first of a number of phases of the highway. The project is being delivered under a 10 year, US$2.5 billion public-private partnership (PPP).
October 11, 2013 Read time: 2 mins
Istanbul is on record as one of the world's most traffic-congested cities
Plans are moving forward in Turkey for the construction of a new highway project. 2579 Mott MacDonald has been named lenders’ technical advisor by the IC Ictas-Astaldi (ICA) consortium for a 60km section of the Northern Marmara highway. This deal is significant and the stretch forms the first of a number of phases of the highway. The project is being delivered under a 10 year, US$2.5 billion public-private partnership (PPP).
 
The project involves the design, construction, maintenance and operation of the 60km dual four lane Northern Marmara highway between Odayeri and Paşaköy. It includes construction of 55km of connecting roads, 19 motorway junctions, 67 viaducts, and seven tunnels and a road/rail stay cable stiffened suspension bridge across the Bosphorus. The new bridge, designed by Michel Virlogeux and Swiss consultant T-Engineering, will be a combined road and rail suspension with a main span of 1.4km. It will be the first long span bridge to accommodate an eight lane highway and a two line railway on the same level, giving it a width of 59m. The structure will also have the world’s tallest towers, at over 320m.
 
Mott MacDonald will carry out a technical due diligence review of the project documentation produced by concession company ICA up to financial close. This will include a review of the transaction documents, design, construction methodology, operation and maintenance proposals, budget, programme, payment mechanism and risk analysis. Following financial close, Mott MacDonald will undertake construction and operations monitoring on behalf of lenders.
 
The new east-west route should alleviate congestion on existing routes across Istanbul, including the two existing bridges across the Bosphorus.

For more information on companies in this article

Related Content

  • Riga Northern Transport Corridor
    February 14, 2012
    The Riga Northern Transport Corridor is an ambitious transport E1.5 billion infrastructure development project involving a new 30km long inner city highway. Its aim is to provide a fast connection between the east and west of Riga City and integrate the city and Riga port into the Trans-European road network. It will include another major new crossing of the Daugava River which is 420m wide at this point. The project will lead to a substantial improvement of transport efficiency in the Riga region and will
  • The world’s longest suspension bridge
    June 24, 2024
    The world’s longest suspension bridge is the 1915 Çanakkale Bridge in Turkey. This engineering marvel links Gelibolu with Lapseki, forming a key section of the 101km highway linking Malkara with Çanakkale. *Article produced in partnership with the General Directorate of Highways (KGM), Ministry of Transport and Infrastructure, Republic of Türkiye.
  • Key deals show strength of Tolling solutions sector
    September 26, 2013
    The world’s leading tolling solution providers have achieved significant deals in recent months emphasising the importance of their latest and proven technology. Guy Woodford reports Kapsch TrafficCom North America (Kapsch), part of Kapsch TrafficCom Group, has been awarded a five-year US$30 million contract by Canadian Tolling Company International (Cantoll). The contract will see the leading tolling technology manufacturer supply its next generation TDMA V6 Interior Transponder, also known as an onboar
  • The Preston Western Distributor
    September 7, 2023
    Costain, as main contractor for the Preston Western Distributor project, was involved from the earliest stages, thanks to the UK’s Early Contractor Involvement approach. The project was delivered on time and on budget to the benefit of the local environment, local businesses and the region’s workforce. David Arminas reports*