Skip to main content

Plans moving forward for key Turkish highway

Plans are moving forward in Turkey for the construction of a new highway project. Mott MacDonald has been named lenders’ technical advisor by the IC Ictas-Astaldi (ICA) consortium for a 60km section of the Northern Marmara highway. This deal is significant and the stretch forms the first of a number of phases of the highway. The project is being delivered under a 10 year, US$2.5 billion public-private partnership (PPP).
October 11, 2013 Read time: 2 mins
Istanbul is on record as one of the world's most traffic-congested cities
Plans are moving forward in Turkey for the construction of a new highway project. 2579 Mott MacDonald has been named lenders’ technical advisor by the IC Ictas-Astaldi (ICA) consortium for a 60km section of the Northern Marmara highway. This deal is significant and the stretch forms the first of a number of phases of the highway. The project is being delivered under a 10 year, US$2.5 billion public-private partnership (PPP).
 
The project involves the design, construction, maintenance and operation of the 60km dual four lane Northern Marmara highway between Odayeri and Paşaköy. It includes construction of 55km of connecting roads, 19 motorway junctions, 67 viaducts, and seven tunnels and a road/rail stay cable stiffened suspension bridge across the Bosphorus. The new bridge, designed by Michel Virlogeux and Swiss consultant T-Engineering, will be a combined road and rail suspension with a main span of 1.4km. It will be the first long span bridge to accommodate an eight lane highway and a two line railway on the same level, giving it a width of 59m. The structure will also have the world’s tallest towers, at over 320m.
 
Mott MacDonald will carry out a technical due diligence review of the project documentation produced by concession company ICA up to financial close. This will include a review of the transaction documents, design, construction methodology, operation and maintenance proposals, budget, programme, payment mechanism and risk analysis. Following financial close, Mott MacDonald will undertake construction and operations monitoring on behalf of lenders.
 
The new east-west route should alleviate congestion on existing routes across Istanbul, including the two existing bridges across the Bosphorus.

For more information on companies in this article

Related Content

  • Turkish tunnel tender underway
    May 9, 2016
    The tender process is underway in Turkey for a major tunnel project. The package of works is for the planning, project and engineering design for a new three-storey underwater tunnel that is planned for Turkey’s commercial centre, Istanbul. Named the Big Istanbul Tunnel, the route is expected to run under the Bosporus. The tunnel is anticipated to feature two storeys carrying vehicle traffic, with a third carrying a rail link. This would cut journey times to just 14 minutes. The engineering work is expected
  • Norway moves ahead with alternative fuel use
    November 9, 2023
    Energy consumption on its road construction sites will increasingly consist of electricity or hydrogen up to 2027.
  • Fluor and ACS Infrastructure Canada win Gordie Howe Bridge deal
    July 6, 2018
    A partnership including Fluor and ACS Infrastructure has been chosen to design, build, finance, operate and maintain the Gordie Howe International Bridge project. The client, Windsor-Detroit Bridge Authority (WDBA), announced the appointment of Bridging North America group in the Canadian city of Windsor, across the Detroit River from Detroit in the US state of Michigan. The Gordie Howe International Bridge will connect the two cities by linking Interstate 75 and Interstate 96 in Michigan with the new
  • Philippine projects central to Southeast Asia infrastructure plan
    January 19, 2015
    Several major road works are among 15 public-private partnership projects in the Philippines tagged by the World Bank as essential for improving transport in Southeast Asia. The list includes the US$3.4 billion Plaridel Bypass toll road, the $354 million North Luzon Expressway East Expressway, the $171 million Central Luzon Link Expressway-Phase II, as well as the $52.5 million improvement, operation and maintenance of Kennon Road and Marcos Highway. All of the projects, which include major airport an