Skip to main content

Planning Netherland's underground highways

The first agreements for Amsterdam’s proposed underground highway have now been reached. These have been made by the Dutch Minister for the Environment and Transport as well as Amsterdam local authority and the province of North-Holland. Under the agreed terms, the A10 highway will feature 12 lanes of traffic in four 1.2km tunnels under the capital, Amsterdam. The project will also include building metro and rail lines underground.
May 15, 2012 Read time: 2 mins
he first agreements for Amsterdam’s proposed underground highway have now been reached. These have been made by the 1346 Dutch Minister for the Environment and Transport as well as Amsterdam local authority and the province of North-Holland.

Under the agreed terms, the A10 highway will feature 12 lanes of traffic in four 1.2km tunnels under the capital, Amsterdam. The project will also include building metro and rail lines underground.

The highway and rail lines form a 150m barrier at present in between Amsterdam and the suburb of Buitenveldert. Amsterdam has been campaigning for a number of years to have the highway and rail lines slotted underground to pave the way for building and general development above. Two new proposals have been made that would feature four tunnels side-by-side rather than a more-expensive two-tier system. These would allow rail and metro lines to be placed in five tunnels above the highway, reducing the estimated cost to e1.74 billion, of which the government would provide e775 million. Using the newly released land could generate e1.165 billion, a profit of up to e199 million and putting the project on a sound economic foundation. If final approval is given in 2010, construction of the highway could be complete in 2016.

However, a report into the proposed road tunnel under Rijnstrangen in the Netherlands suggests that the project would exceed the budget. The report was carried out by consultancy firm Strukton, which has released the information to the authorities in Zevenaar, Groessen and Duiven that an 8km road tunnel under the Rijnstrangen green area is possible, but that construction alone would cost e1.2 billion, considerably more than the e750 million budgeted for the work. Local communities propose that the A15 be extended to meet the A18 in a bid to ease congestion in the region, but the notion has been knocked back by the Transport Ministry due to concerns over sustainability. Central government prefers a solution via the A12, which would impact the Groessen community.

Meanwhile the contract for the fast-track project B has been awarded to 1348 VolkerInfra, Combinatie 1349 Van Hattum en Blankevoort, 1350 KWS INfra, 1355 Boskalis and 1357 Hollandia. The contract concerns the widening and relocation of the N50 national road between Rampsol and Ens. The new road is to open in spring 2013.

For more information on companies in this article

Related Content

  • Tackling winter maintenance
    May 8, 2012
    Winter weather often brings traffic chaos, and authorities have to be ready to tackle it as Patrick Smith reports. Good winter maintenance is rarely noticed, and it is only when things go wrong that it becomes a public issue. "When sudden bouts of cold weather bring traffic chaos, icy roads receive high-profile coverage and local authorities are criticised, often unfairly, for not affording greater protection," says the Highways Term Maintenance Association (HTMA), the UK's top trade body for road mainten
  • Curved girders for the Gaasperdammerweg A9 section in Amsterdam
    May 22, 2018
    Dutch authorities recently needed to add traffic lanes to two flyovers at the Holendrecht junction on the Gaasperdammerweg section of the A9 motorway in Amsterdam It was in November 2014 that the Directorate-General for Public Works and Water Management of the Netherlands Rijkswaterstaat awarded the A9 Gaasperdammerweg public-private-partnership project to IXAS Zuid-Oost, a consortium consisting of Ballast Nedam, Fluor, Heijmans and 3i Infrastructure. The A9 Gaasperdammerweg project is the third section
  • The road to climate change mitigation starts at Highways UK
    February 17, 2020
    David Arminas explored climate change innovation on display at Highways UK in Birmingham, England
  • Major bridge widening project going to plan
    May 2, 2012
    When built it was determined that a vital US road/rail bridge would always be widened.