Skip to main content

Planned Bosnia highway project on track

The project to construct Bosnia’s Corridor Vc highway is on track, with completion scheduled for 2020. So far some 6km of the highway has been built, which includes a 3km tunnel stretch. In all the Corridor Vc project calls for the construction of a 330km highway. The Bosnian motorway company, Autoceste Federacije BiH, has not so far revealed the cost of the project however.
August 29, 2014 Read time: 1 min

The project to construct Bosnia’s Corridor Vc highway is on track, with completion scheduled for 2020. So far some 6km of the highway has been built, which includes a 3km tunnel stretch. In all the Corridor Vc project calls for the construction of a 330km highway. The Bosnian motorway company, Autoceste Federacije BiH, has not so far revealed the cost of the project however.

Related Content

  • Bosnia gets €750 million loan for Corridor 5C motorway
    March 1, 2018
    Bosnia has signed a European loan agreement worth €750 million for several sections of work on the Corridor 5V motorway project. Denis Zvizdic, head of government for Bosnia and Herzegovina, said the deal was signed in London during a recent investment conference on the western Balkans. Of the loan amount, the Federation of Bosnia and Herzegovina will get €500 million and the internal but autonomous Republika Srpska will receive €250 million. The money will be used for constructing four 70km sections of
  • Breakthrough for Bosnia’s Vranduk Tunnel
    March 7, 2022
    The twin-tube Vranduk Tunnel is being built using the new Austrian tunnel method by Azerbaijan's Azvirt and Hering dd Siroki Brijeg contractors.
  • Large companies show interest in Bosnia’s Corridor Vc motorway, says minister
    April 12, 2013
    Many large concessionaires have shown interest in the construction of the Corridor Vc motorway, according to Bosnian Minister of Transport and Telecoms, Damir Hadzic. When completed, the Bosnian section of the international Corridor Vc is planned to run for 330km through Bosnia and Herzegovina.
  • Bosnia cancels a tender for Corridor 5C, part of European route E73
    March 13, 2017
    Bosnia is cancelling a tender for part of its Corridor 5C project, an integral part of the class-A north-south central European route E73. Route E73 runs around 700km from Hungary south through eastern Croatia to Bosnia and Herzegovina and the Adriatic Sea in the area of Ploče port. The longest part of this corridor goes through Bosnia and Herzegovina – nearly 340km. Director of the Bosnian motorways company Autoput FBiH, Adnan Terzic, confirmed the cancelled tender to the Bosnian daily newspaper Dnev