Skip to main content

Pittsburgh plans propose Parsons for bridge project

Parsons Brinckerhoff is handling the design contract for a new bridge in the US city of Pittsburgh. The new structure will replace an existing 89-year-old bridge on South Negley Avenue and the contract was awarded by the authorities in the City of Pittsburgh. The existing bridge carries South Negley Avenue over the Port Authority of Allegheny County East Busway and the Norfolk Southern Railroad. It carries around 15,000 vehicles/day and connects East Liberty and Shadyside. Originally built in 1924 and rehab
January 9, 2014 Read time: 2 mins
2693 Parsons Brinckerhoff is handling the design contract for a new bridge in the US city of Pittsburgh. The new structure will replace an existing 89-year-old bridge on South Negley Avenue and the contract was awarded by the authorities in the City of Pittsburgh. The existing bridge carries South Negley Avenue over the Port Authority of Allegheny County East Busway and the Norfolk Southern Railroad. It carries around 15,000 vehicles/day and connects East Liberty and Shadyside. Originally built in 1924 and rehabilitated in 1973, the existing superstructure is a Warren Pratt truss featuring two lanes and sidewalks on both sides. Parsons Brinckerhoff will serve as prime consultant for preliminary engineering, final design, and construction-phase services for the new bridge. The team will also evaluate customised lighting and architectural features for community cohesion. Accelerated bridge construction techniques will be employed to reduce construction time, which should commence in 2016 and be completed in one construction season.

For more information on companies in this article

Related Content

  • New bridge being planned for German city Bonn
    July 16, 2018
    A new bridge project is being planned for the German city of Bonn. The city has three bridges crossing the Rhein River, the North, South and Kennedy Bridges. The North Bridge is in need of replacement as it is no longer able to meet the city’s traffic needs. The existing structure will be demolished and replaced with a new bridge in a project worth €205 million. Plans should be ready for the new link in 2020, with construction expected to commence in 2028.
  • Formwork innovations help bridge building
    July 7, 2015
    A series of formwork developments are helping with challenging bridge construction projects around the world - Mike Woof writes In the Polish city of Krakow, a cost-effective cable stayed bridge is being constructed using a balanced cantilever technique. The current expansion of the Krakow metropolitan railway network (KST) requires the building of a crossing of the Krakow-Plaszow railway junction. Ensuring that daily rail operations remained unaffected during the construction of the 252m long crossing w
  • Making the U-turn
    August 2, 2012
    Political hostility to a toll road project in Australia has been turned around by the quality and amenity of the project writes Adrian Greeman Cars, trucks and vans were taking to the new EastLink toll road in Melbourne with enthusiasm this July, pleased to try out its 39km route for time and cost savings. As well as the convenience of the uncongested route, drivers were also able to view an extraordinary multi-shaded perspective of transparent green and orange noise wall panels, burnt earth-coloured retai
  • CRCP is first choice for Belgian highway
    November 28, 2012
    Dan Gilkes reports on a Belgian highway upgrade When the Ministry of Public Works in the Belgian State of Flanders decided to reconstruct and resurface 19km of the N49 Antwerp-Knokke Expressway, continuously reinforced concrete paving (CRCP) with an exposed aggregate surface was the natural material choice. Indeed exposed aggregate, with its high grip and low noise benefits, has been the first option for all motorway surfacing work in Belgium since the 1980s. However, the €15.65 million contract is not a li