Skip to main content

Pittsburgh plans propose Parsons for bridge project

Parsons Brinckerhoff is handling the design contract for a new bridge in the US city of Pittsburgh. The new structure will replace an existing 89-year-old bridge on South Negley Avenue and the contract was awarded by the authorities in the City of Pittsburgh. The existing bridge carries South Negley Avenue over the Port Authority of Allegheny County East Busway and the Norfolk Southern Railroad. It carries around 15,000 vehicles/day and connects East Liberty and Shadyside. Originally built in 1924 and rehab
January 9, 2014 Read time: 2 mins
2693 Parsons Brinckerhoff is handling the design contract for a new bridge in the US city of Pittsburgh. The new structure will replace an existing 89-year-old bridge on South Negley Avenue and the contract was awarded by the authorities in the City of Pittsburgh. The existing bridge carries South Negley Avenue over the Port Authority of Allegheny County East Busway and the Norfolk Southern Railroad. It carries around 15,000 vehicles/day and connects East Liberty and Shadyside. Originally built in 1924 and rehabilitated in 1973, the existing superstructure is a Warren Pratt truss featuring two lanes and sidewalks on both sides. Parsons Brinckerhoff will serve as prime consultant for preliminary engineering, final design, and construction-phase services for the new bridge. The team will also evaluate customised lighting and architectural features for community cohesion. Accelerated bridge construction techniques will be employed to reduce construction time, which should commence in 2016 and be completed in one construction season.

For more information on companies in this article

Related Content

  • Peru’s Matarani – Punta de Bonbon Highway
    January 5, 2016
    A major new highway project in Peru will improve connectivity for the Arequipa region - Mauro Nogarin writes Peru’s Matarani-Bonbon road project is an important route and forms part of the Camana - Dv Quilca - Ilo - Tacna highway project. The road stretches through several provinces in the Arequipa region. The deadline for completing the work is 720 days after January 2015, and it is scheduled to be completed by December 2016. Progress has been good and as of July 2015, it was 80% completed. The main
  • Melbourne link: Hyder and Parsons Brinckerhoff to be design team
    October 22, 2014
    Hyder and Parsons Brinckerhoff have been appointed as the design team for the US$5.97 billion East West Link in Melbourne, Australia. The two engineering and management consultancies are in a 50/50 joint venture to provide detailed design and construction support services for the 6.6km Stage 1 work, which is the eastern section, of the project. Together with the proposed western section, the completed East West Link will cost around $7 billion. The toll road will form an 18km cross-city connection ext
  • US$113 million Michigan bridge replacement
    July 30, 2024
    A US$113 million Michigan bridge replacement job has been awarded.
  • A history lesson in private public partnerships
    February 15, 2012
    Michel Démarre gives some historical insights into public-private partnerships conceived to implement urban infrastructure projects, a concept that surprisingly dates back to as early as the 13th century!