Skip to main content

Pittsburgh plans propose Parsons for bridge project

Parsons Brinckerhoff is handling the design contract for a new bridge in the US city of Pittsburgh. The new structure will replace an existing 89-year-old bridge on South Negley Avenue and the contract was awarded by the authorities in the City of Pittsburgh. The existing bridge carries South Negley Avenue over the Port Authority of Allegheny County East Busway and the Norfolk Southern Railroad. It carries around 15,000 vehicles/day and connects East Liberty and Shadyside. Originally built in 1924 and rehab
January 9, 2014 Read time: 2 mins
2693 Parsons Brinckerhoff is handling the design contract for a new bridge in the US city of Pittsburgh. The new structure will replace an existing 89-year-old bridge on South Negley Avenue and the contract was awarded by the authorities in the City of Pittsburgh. The existing bridge carries South Negley Avenue over the Port Authority of Allegheny County East Busway and the Norfolk Southern Railroad. It carries around 15,000 vehicles/day and connects East Liberty and Shadyside. Originally built in 1924 and rehabilitated in 1973, the existing superstructure is a Warren Pratt truss featuring two lanes and sidewalks on both sides. Parsons Brinckerhoff will serve as prime consultant for preliminary engineering, final design, and construction-phase services for the new bridge. The team will also evaluate customised lighting and architectural features for community cohesion. Accelerated bridge construction techniques will be employed to reduce construction time, which should commence in 2016 and be completed in one construction season.

For more information on companies in this article

Related Content

  • Award winning bridge for North Carolina
    November 21, 2019
    A new bridge in the US state of North Carolina has won a key award for excellence – Mike Woof writes
  • Bids in for Estonia’s Pärnu to Uulu road
    May 31, 2022
    Six companies are bidding for a key road project in Estonia: Verston, Nordecon, GRK, TREV-2, KMG and TREF Nord.
  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.
  • Presidio Parkway: the Golden Gate Bridge’s new southern approach road
    May 29, 2013
    Work on the Presidio Parkway, a new breathtaking and eco-friendly southern approach road to San Francisco’s Golden Gate Bridge, has entered its crucial second and final phase. As Guy Woodford reports, the vital US$1 billion project has overcome legal as well as environmental challenges to stay on course for its expected 2016 completion Just after 9pm on Friday April 27, 2012 a large public crowd looked on excitedly as a fleet of more than 40 R&L Brosamer and Ferma Corporation deployed hydraulic demolition h