Skip to main content

Pittsburgh plans propose Parsons for bridge project

Parsons Brinckerhoff is handling the design contract for a new bridge in the US city of Pittsburgh. The new structure will replace an existing 89-year-old bridge on South Negley Avenue and the contract was awarded by the authorities in the City of Pittsburgh. The existing bridge carries South Negley Avenue over the Port Authority of Allegheny County East Busway and the Norfolk Southern Railroad. It carries around 15,000 vehicles/day and connects East Liberty and Shadyside. Originally built in 1924 and rehab
January 9, 2014 Read time: 2 mins
2693 Parsons Brinckerhoff is handling the design contract for a new bridge in the US city of Pittsburgh. The new structure will replace an existing 89-year-old bridge on South Negley Avenue and the contract was awarded by the authorities in the City of Pittsburgh. The existing bridge carries South Negley Avenue over the Port Authority of Allegheny County East Busway and the Norfolk Southern Railroad. It carries around 15,000 vehicles/day and connects East Liberty and Shadyside. Originally built in 1924 and rehabilitated in 1973, the existing superstructure is a Warren Pratt truss featuring two lanes and sidewalks on both sides. Parsons Brinckerhoff will serve as prime consultant for preliminary engineering, final design, and construction-phase services for the new bridge. The team will also evaluate customised lighting and architectural features for community cohesion. Accelerated bridge construction techniques will be employed to reduce construction time, which should commence in 2016 and be completed in one construction season.

For more information on companies in this article

Related Content

  • VIDEO – Explosive blast apart redundant US bridge
    July 13, 2015
    The Donora-Webster Bridge over the Monongahela River in the US has been demolished using explosives. The ageing structure spanned the Monongahela River, connecting Washington and Westmoreland Counties in Pennsylvania. The bridge was built in 1908 and originally carried a rail link but in 1938 the tracks were removed and the structure was modified so that it could handle motor vehicle traffic instead. The Donora-Webster Bridge linked Route 837 on the west side of the Monongahela River with Route 906 on the east bank.
  • Poland's ambitious highway construction plans
    July 10, 2012
    The European football championships are among a number of things pushing Poland's ambitious highway building programme. Patrick Smith reports. Poland is planning to spend a colossal €4.57 billion on road projects in 2009, a 35% increase over the previous year. T
  • Massey Tunnel project to be Design-Build-Finance-Operate-Maintain
    January 25, 2016
    The provincial British Columbia government in western Canada has chosen a Design-Build-Finance-Operate-Maintain (DBFOM) procurement model for the Vancouver region’s 10-lane bridge replacement for the ageing Massey Tunnel. The US$2.5 billion project includes a bridge and related Highway 99 improvements between Bridgeport Road in the adjacent city of Richmond and Highway 91 in the city of Delta. The 60-year-old tunnel now carries its limit of 80,000 vehicles a day and is often congested during rush hours.
  • Consultation soon for Vancouver area’s Massey Tunnel replacement
    September 19, 2019
    The Canadian province of British Columbia could put options for a Massey Tunnel replacement out to consultation late this year or early next. A statement from the BC ministry of transportation and infrastructure said the government is in discussions with various stakeholders about which options it will put out for consultation. Whatever option is chosen to replace the ageing four-lane Massey Tunnel – be it a bridge or another tunnel – it will be will be either six or eight lanes, according to the gove