Skip to main content

Philippines expressway extension project planned

San Miguel (SMC) plans to extend the Skyway Stage 3 project in the Philippines. The link will measure close to 15km long and will provide a new route to and from eastern Metro Manila. The US$843.6 million project is intended to carry a high proportion of heavy vehicles, currently using other routes. This six lane stretch of elevated tollroad is being built to provide a link between the North Luzon Expressway (NLEx) and South Luzon Expressway (SLEx). The route of the new extension section looks likely to run
January 19, 2017 Read time: 1 min
San Miguel (SMC) plans to extend the Skyway Stage 3 project in the Philippines. The link will measure close to 15km long and will provide a new route to and from eastern Metro Manila. The US$843.6 million project is intended to carry a high proportion of heavy vehicles, currently using other routes. This six lane stretch of elevated tollroad is being built to provide a link between the North Luzon Expressway (NLEx) and South Luzon Expressway (SLEx). The route of the new extension section looks likely to run through C-3, the Pasig River and the San Juan River and will be the last of three phases Metro Manila Skyway System to be built.

Related Content

  • Cross Fraser Partnership wins BC tunnel work
    September 27, 2024
    The partnership for the tunnel work near Vancouver in Canada consists of Pomerleau BC, Bouygues Construction Canada and Fomento de Construcciones y Contratas Canada (FCC) and is supported by design and engineering consultant Arcadis.
  • Formwork innovations help bridge building
    July 7, 2015
    A series of formwork developments are helping with challenging bridge construction projects around the world - Mike Woof writes In the Polish city of Krakow, a cost-effective cable stayed bridge is being constructed using a balanced cantilever technique. The current expansion of the Krakow metropolitan railway network (KST) requires the building of a crossing of the Krakow-Plaszow railway junction. Ensuring that daily rail operations remained unaffected during the construction of the 252m long crossing w
  • UAE highway first section opening to traffic
    July 16, 2018
    A new highway section is now open to traffic in the UAE. This highway is designed to connect the north and south of Ras Al Khaimah emirate, extending from the Emirates Road. The new highway features three lanes in either direction, with a maximum speed limit of 140km/h and is designed to carry up to 60,000 vehicles/day. Featuring 10 intersections the Ras Al Khaimah Ring Road will measure 30km-long when complete. Work is being carried out on a number of bridges along the route with the rest of the highway li
  • Rio’s 2014 roads plan
    May 11, 2012
    The authorities in Brazil’s Rio de Janeiro State intend to invest US$1.55 billion in the road network from now until 2014. Work will be carried out to some 750km of roads with funding being provided by a combination of PPPs and sources such as the World Bank (WB) and the Latin American Development Bank (CAF).