Skip to main content

Philippines expressway connector project under construction

Construction work is starting in the Philippines for the new link that will connect the North Luzon Expressway (NLEx) and the South Luzon Expressway (SLEx). The project is costing nearly US$430 million, with the link being built by local toll road firm NLEX Corp. The new link road will be 8km long, running from the end of Harbor Link in Caloocan City to the Polytechnic University of the Philippines (PUP) in Santa Mesa of Manila. The road link will be elevated and the work is due for completion in 2021.
March 11, 2019 Read time: 1 min

Construction work is starting in the Philippines for the new link that will connect the North Luzon Expressway (NLEx) and the South Luzon Expressway (SLEx). The project is costing nearly US$430 million, with the link being built by local toll road firm NLEX Corp. The new link road will be 8km long, running from the end of Harbor Link in Caloocan City to the Polytechnic University of the Philippines (PUP) in Santa Mesa of Manila. The road link will be elevated and the work is due for completion in 2021.

Related Content

  • US$690 million for Indonesia toll tunnel
    September 3, 2024
    Funding worth US$690 million is planned for Indonesia’s toll tunnel.
  • New road projects are being proposed for the Philippines
    January 6, 2017
    Major new highway projects are now underway in the Philippines. The tender process is opening for the Laguna Lakeshore Expressway-Dike project, which will be worth some US$2.59 billion in all. The new expressway will connect Los Banos with Taguig City and when it is complete, will improve journey times from Laguna to Metro Manila by cutting congestion. Just over half of the sum will be used to build the expressway itself, while the rest will be used to construct a new flood control dike as well as to carry
  • Philippines: Leighton and DM Consunji to develop Calax project
    August 6, 2015
    Leighton Holdings and DM Consunji have been chosen by Metro Pacific Investment to develop the Cavite-Laguna Expressway – Calax -- project in the Philippines. Work on the US$757 million is set to start in July next year and run to July 2020. Maintenance and operations on the 47km highway is under a 30-year contract running from 2020. The motorway will start at Cavitex and end at the SLEX-Mamplasan Interchange.
  • Major tunnel project underway in Bangladesh
    March 1, 2019
    A major tunnel construction project is now underway in Bangladesh, the first tunnel in the country to be constructed under a river.