Skip to main content

Philippines bridge projects planned

Plans are in hand in the Philippines for a series of bridge construction projects. Two of the key bridge projects are for links between Luzon and Samar Island and from Leyte Island to Surigao. The work is expected to cost some US$3.85 billion. Construction work could commence in early 2018.
March 9, 2017 Read time: 1 min
Plans are in hand in the Philippines for a series of bridge construction projects. Two of the key bridge projects are for links between Luzon and Samar Island and from Leyte Island to Surigao. The work is expected to cost some US$3.85 billion. Construction work could commence in early 2018.

Related Content

  • Philippino project
    February 7, 2012
    Work is due to start on the Tarlac-Pangasinan-La Union Expressway (TPLEx) in the Philippines in March 2010. The new highway will cut travel time and help boost economic development in and around Luzon.
  • A bridge of hope?
    July 18, 2012
    As Russia prepares for a major Asia Pacific conference in nearly four years' time, the economic climate is felt in other countries in the region. Patrick Smith reports AUS$1 billion-plus suspension bridge is to be built to link the city of Vladivostok in the far east of Russia and Russky Island. Russia's President Dmitry Medvedev has signed an instruction for construction of the 3,150m long bridge, which is intended to provide access to the 24th Asia Pacific Economic Cooperation (APEC) summit, to be held o
  • Romania’s important bridge project
    October 5, 2022
    Romania’s important Braila Bridge project will deliver a key crossing spanning the Danube River
  • Norwegian bridge faces questions
    October 16, 2019
    The cost of the planned bridge connecting Sotra Island to mainland Norway may be considerably higher than originally anticipated. The project could cost as much as €1.78 billion to carry out, which includes building the necessary road links and tunnel sections. With the concession for the bridge being planned as a 20-year package, there is concern that this will not be a viable deal for Norwegian firms. Construction is intended to be complete by 2026. A number of international firms have expressed an intere