Skip to main content

Paruvian road concession package cancelled

The concession package for Peru’s Vía Expresa Sur road project is being cancelled. The deal was originally awarded to the Peruvian company, Grana y Montero (GyM). However the involvement of Brazilian firm Odebrecht in the project have resulted in the deal being cancelled. Odebrecht has been linked to string of corruption scandals. The tender process for the 5km road section will be reopened as a result. The project is intended to cut journey times in Lima, with the work expected to cost US$200 million.
April 26, 2019 Read time: 1 min

The concession package for Peru’s Vía Expresa Sur road project is being cancelled. The deal was originally awarded to the Peruvian company, Grana y Montero (GyM). However the involvement of Brazilian firm 1305 Odebrecht in the project have resulted in the deal being cancelled. Odebrecht has been linked to string of corruption scandals. The tender process for the 5km road section will be reopened as a result. The project is intended to cut journey times in Lima, with the work expected to cost US$200 million.

For more information on companies in this article

Related Content

  • Roads for Regional Enhancement
    November 1, 2012
    IRF once more broke ground by gathering over 600 regional transport officials for the world's first comprehensive review of sustainable transport solutions in the context of the Andean Region. Lima, Peru, an important regional crossroads for trade and a hub for engineering know-how, offered an ideal backdrop for the Congress. The event offered a comprehensive panorama of design, construction, and maintenance solutions adapted to the region's exceptionally complex topography. Geological and climatic conside
  • Think About Tomorrow Today: CONEXPO Latin America Seminars
    August 18, 2016
    The Association of Equipment Manufacturers (AEM) announces that the speaker line-up now includes Chile’s ministry of energy as well as senior thought leaders in Caterpillar, Cummins, Telogis and Americas Market Intelligence. They’ll join keynote speaker Derek Woodgate of the Futures Lab, who is helping guide development of The Tech Experience at CONEXPO-CON/AGG 2017. Equipment manufacturers and contractors, large and small, face uncertain times. With construction markets still sluggish but showing sig
  • Solving Sao Paulo's traffic congestion problems
    July 10, 2012
    The Brazilian city of Sao Paulo suffers a heavily congested road network. Huge traffic jams up to 100km long are common and can be even 200km long in bad weather or at weekends and holidays. Of the 1.1 million vehicles that drive into Sao Paulo every day, almost a third are passing through and the new Rodoanel Mario Covas orbital route is intended to tackle the problem. This is a 170km long highway around the city that will connect the 10 highways linking Sao Paulo and allow many vehicles to avoid the conge
  • Bolivia dual carriageway project stalled
    September 12, 2016
    Work remains at a halt on the 70km dual carriageway upgrade connecting Yapacani with Montero in Bolivia’s Santa Cruz department. A disagreement between the Mexican construction company that was building the link, Tradeco, and Bolivia’s road administration department, ABC, resulted in the contract being cancelled. The route, Highway 4, runs from Yapacani through Santa Fe, San Carlo and Portachuelo to Montero and the project was intended to improve the road and boost its capacity by increasing the number of l