Skip to main content

Parsons wins US-Canada bridge contract

Parsons has won a three-year contract from the Michigan Department of Transportation to carry out work on the Blue Water Bridge. The firm will provide structural services for the Michigan-owned portion of The Blue Water Bridge, which crosses the St Clair River and connects Routes I-94/I-69 in Port Huron, Michingan, with Highway Route 402 in Point Edward, Ontario, Canada.
October 7, 2016 Read time: 1 min
RSS

3220 Parsons has won a three-year contract from the Michigan Department of Transportation to carry out work on the Blue Water Bridge. The firm will provide structural services for the Michigan-owned portion of The Blue Water Bridge, which crosses the St Clair River and connects Routes I-94/I-69 in Port Huron, Michingan, with Highway Route 402 in Point Edward, Ontario, Canada. This twin-span international bridge links Canada and the United States and is the second busiest crossing between the two countries.

The three-year contract covers structural engineering, inspection, structural design, emergency repair consultation, general studies and reports, and as-needed engineering services for the Blue Water Bridge, approach bridges, and mechanically stabilised earth (MSE) walls.

For more information on companies in this article

Related Content

  • Fluor and ACS Infrastructure Canada win Gordie Howe Bridge deal
    October 2, 2018
    Bridging North America will build the Gordie Howe Bridge, named after a famous Canadian ice hockey player and leading scorer A partnership including Fluor Canada and ACS Infrastructure Canada has been chosen to design, build, finance, operate and maintain the Gordie Howe International Bridge project. The client, Windsor-Detroit Bridge Authority (WDBA), announced the appointment of Bridging North America group in the Canadian city of Windsor, across the Detroit River from Detroit in the US state of Michig
  • Parsons is handling a major interchange project in North Carolina
    June 21, 2017
    Parsons is handling the design for a major interchange project in North Carolina. The firm will carry out key elements of design for the I-26/US 74/NC 108 Interchange Project. The deal was awarded by the North Carolina Department of Transportation (NCDOT).
  • Possible delays for Gordie Howe Bridge
    November 15, 2022
    The tolled six-lane cable-stayed bridge over the Detroit River will connect the city of Windsor in the Canadian province of Ontario with Detroit in the neighbouring US state of Michigan.
  • A new Indian cable-stayed bridge will improve transport connections
    March 2, 2015
    A major new cable-stayed bridge is being constructed in India - Partha Bratim Basistha reports. In India the construction of a major cable-stayed bridge is underway that will boost connections from capital Delhi to its surrounding areas. The bridge is being built in a bid to ease growing interstate traffic movement between Delhi and the surrounding North Indian states of Punjab, Uttar Pradesh, Haryana and Himachal Pradesh. Named Signature Bridge, this is a landmark structure due to its design aesthetics and