Skip to main content

Parsons wins Florida interchange redesign contract

The Florida Department of Transportation has awarded Parsons a contract to carry out an analysis of the I-95 Interchange with LPGA Boulevard in Volusia County. The contract involves analysing the conceptual layout and ultimate reconfiguration of the interchange, followed by providing final design services once the best solution has been selected. The work is needed as traffic and congestion are expected to increase due to the rise in residential and commercial development in the Daytona Beach area. The I-9
February 23, 2017 Read time: 2 mins
Parsons will carry out a project to research and then upgrade a busy interchange on I-95 in Florida
The 2697 Florida Department of Transportation has awarded 3220 Parsons a contract to carry out an analysis of the I-95 Interchange with LPGA Boulevard in Volusia County. The contract involves analysing the conceptual layout and ultimate reconfiguration of the interchange, followed by providing final design services once the best solution has been selected.

The work is needed as traffic and congestion are expected to increase due to the rise in residential and commercial development in the Daytona Beach area. The I-95/LGPA Boulevard interchange is a crucial access point during morning and evening rush-hour traffic. The proposed reconfiguration will improve traffic conditions by boosting capacity to handle the projected traffic through the 2040 design year. Staged construction with interim improvements will be considered to address safety and operational issues associated with the current interchange configuration.

The Parsons team will analyse traffic patterns, propose conceptual interchange modifications and collaborate with area planning organisations and local government. The aim will be to alleviate traffic queues, increase driver safety, and improve the overall traffic flow. After FDOT District 5 approves the interchange concept, Parsons will prepare an interchange modification report and develop engineering plans for construction.

For more information on companies in this article

Related Content

  • What lies beneath Down Under
    January 11, 2021
    The third and final construction stage on Sydney’s WestConnex project has begun, including the underground Rozelle Interchange – with a lot of help from Komatsu
  • Final beam for Gerald Desmond replacement
    June 18, 2020
    The final steel beam has been installed for the replacement Port of Long Beach bridge - California’s first cable-stayed bridge for vehicles.
  • Plans to extend highway 427 in Canada
    May 21, 2013
    Plans are in hand in Canada to extend Highway 427 by 6.6km. The final decision over the project has yet to be made by the Ontario Government. The work is expected to cost in the region of C$500 million (US$491 million) to carry out. The work is required as the highway carries a heavy traffic volume and the extension will help reduce congestion in the surrounding area. The work should commence in 2017 once the necessary approvals have been given and the construction would then require an estimated 36 months.
  • The drive for US road funding: will corporate America get a seat?
    September 13, 2017
    Trumponomics aims to use public money for pump-priming an even greater amount of cash from the private sector to improve America’s crumbling roads. But is political will matching corporate America’s enthusiasm for more private investment, asks David Arminas If there were ever a test case for comparing public-private partnerships and design-build contracts, the recently completed Ohio River Bridges Project is it (see previous article).