Skip to main content

Parsons wins Florida interchange redesign contract

The Florida Department of Transportation has awarded Parsons a contract to carry out an analysis of the I-95 Interchange with LPGA Boulevard in Volusia County. The contract involves analysing the conceptual layout and ultimate reconfiguration of the interchange, followed by providing final design services once the best solution has been selected. The work is needed as traffic and congestion are expected to increase due to the rise in residential and commercial development in the Daytona Beach area. The I-9
February 23, 2017 Read time: 2 mins
Parsons will carry out a project to research and then upgrade a busy interchange on I-95 in Florida
The 2697 Florida Department of Transportation has awarded 3220 Parsons a contract to carry out an analysis of the I-95 Interchange with LPGA Boulevard in Volusia County. The contract involves analysing the conceptual layout and ultimate reconfiguration of the interchange, followed by providing final design services once the best solution has been selected.

The work is needed as traffic and congestion are expected to increase due to the rise in residential and commercial development in the Daytona Beach area. The I-95/LGPA Boulevard interchange is a crucial access point during morning and evening rush-hour traffic. The proposed reconfiguration will improve traffic conditions by boosting capacity to handle the projected traffic through the 2040 design year. Staged construction with interim improvements will be considered to address safety and operational issues associated with the current interchange configuration.

The Parsons team will analyse traffic patterns, propose conceptual interchange modifications and collaborate with area planning organisations and local government. The aim will be to alleviate traffic queues, increase driver safety, and improve the overall traffic flow. After FDOT District 5 approves the interchange concept, Parsons will prepare an interchange modification report and develop engineering plans for construction.

For more information on companies in this article

Related Content

  • Busy UK interchange on M1 motorway close to completion
    August 28, 2018
    Work on a busy interchange on the UK motorway network is close to completion. The new off-slip has opened at junction 24 of the M1 motorway. The work to upgrade junction 24 and junction 24a is being carried out by contractor Winvic Construction. The new off-slip at junction 24 provides a direct connection from the A50 eastbound to the M1 southbound. The work forms part of SEGRO’s Nationally Significant Infrastructure Project (NSIP) - SEGRO Logistics Park East Midlands Gateway (EMG) - a ground-breaking
  • Moscow city government to build relief roads and highways
    June 6, 2016
    Moscow’s congestion problems need addressing but there are different solutions that could provide the answer – Eugene Gerden writes Moscow’s city government is considering building relief roads to ease congestion on the city’s key roads and highways. This plan has been revealed by recent statements from Marat Khusnullin, deputy mayor for urban policy and construction of the Moscow city government.
  • New Central Ring Road around Moscow to be built by 2018
    September 30, 2013
    Eugene Gerden evaluates Moscow’s new ring road mega project The Russian government plans to complete implementation of one of the most ambitious projects in the country’s road building industry in recent years, which involves construction of The Central Ring Road around Moscow by 2018. The new road should be built by the next presidential elections, while its length will be 339km. It is expected to be comprised of five sections and will be located 50km away from Moscow Ring Road, a ring road encircling the
  • New bridge link needed for Cape Cod
    October 9, 2019
    New bridge links are needed for Cape Cod, in the US state of Massachusetts.