Skip to main content

Parsons wins bridge deal in Arkansas

Parsons is heading the project to build the I-40 White River Bridge and approaches in the US state of Arkansas. The contract is to build a 1.92km bridge for the Arkansas State Highway and Transportation Department and Parsons is leading the joint venture that also includes CJ Mahan construction. The new bridge will be constructed some 61m upstream from the existing structure. The existing White River Bridge has four 3.66m-wide lanes and 61m of vertical clearance between piers for commercial navigation
January 17, 2017 Read time: 2 mins
3220 Parsons is heading the project to build the I-40 White River Bridge and approaches in the US state of Arkansas. The contract is to build a 1.92km bridge for the Arkansas State Highway and Transportation Department and Parsons is leading the joint venture that also includes CJ Mahan construction.  The new bridge will be constructed some 61m upstream from the existing structure.  

The existing White River Bridge has four 3.66m-wide lanes and 61m of vertical clearance between piers for commercial navigation vessels. The new bridge will have 18 spans comprising six lanes and will provide 98m of horizontal clearance between the two main river piers and 15.8m of clearance above the White River. It will feature drilled shaft foundations instead of pile foundations as this will reduce costs as well as the time needed for construction. In addition, construction of the new link will include demolition of the old bridge, earthwork, traffic maintenance, and erosion control.

I-40 is an east-west interstate highway connecting Oklahoma and Tennessee with the majority of the route in Arkansas. Construction of the new White River Bridge and its approach roads is scheduled to begin in March 2017 and is expected to be complete in summer 2019. Once the new bridge is in operation its additional lanes will boost capacity will help improve journey times as well as safety for drivers in the area.

For more information on companies in this article

Related Content

  • Champlain Bridge set to open by end of year, says SNC-Lavalin
    March 6, 2018
    The replacement Champlain Bridge in Montreal will open on schedule at the end of the year, according to the SNC-Lavalin-led consortium heading the project. Cost of the entire corridor project is set at US$3.3 billion of which around $1.8 billion is for construction of the bridge, approach roads and highway adjustments. Failure to open the bridge to vehicular traffic on time means the consortium faces stiff fines, according to media reports: around $77,500 a day for the first seven days followed by $31
  • Bridge demolition with breakers
    May 5, 2021
    Hydraulic breakers from Italian firm Indeco have been used successfully to carry out important work on the Princes Freeway in Australia’s Victoria State.
  • Italy’s renaissance bridge
    July 21, 2020
    Italian consulting company Italferr created a digital twin for designing the new Genoa bridge and won accolades at Bentley Systems: Bentley Year in Infrastructure Awards
  • Alabama bridge and highway project gets clearance
    September 2, 2019
    Environmental clearance has been awarded by the US Federal Highway Administration (FHWA) for the Interstate 10 Mobile River Bridge and Bayway project.