Skip to main content

Parsons wins bridge deal in Arkansas

Parsons is heading the project to build the I-40 White River Bridge and approaches in the US state of Arkansas. The contract is to build a 1.92km bridge for the Arkansas State Highway and Transportation Department and Parsons is leading the joint venture that also includes CJ Mahan construction. The new bridge will be constructed some 61m upstream from the existing structure. The existing White River Bridge has four 3.66m-wide lanes and 61m of vertical clearance between piers for commercial navigation
January 17, 2017 Read time: 2 mins
3220 Parsons is heading the project to build the I-40 White River Bridge and approaches in the US state of Arkansas. The contract is to build a 1.92km bridge for the Arkansas State Highway and Transportation Department and Parsons is leading the joint venture that also includes CJ Mahan construction.  The new bridge will be constructed some 61m upstream from the existing structure.  

The existing White River Bridge has four 3.66m-wide lanes and 61m of vertical clearance between piers for commercial navigation vessels. The new bridge will have 18 spans comprising six lanes and will provide 98m of horizontal clearance between the two main river piers and 15.8m of clearance above the White River. It will feature drilled shaft foundations instead of pile foundations as this will reduce costs as well as the time needed for construction. In addition, construction of the new link will include demolition of the old bridge, earthwork, traffic maintenance, and erosion control.

I-40 is an east-west interstate highway connecting Oklahoma and Tennessee with the majority of the route in Arkansas. Construction of the new White River Bridge and its approach roads is scheduled to begin in March 2017 and is expected to be complete in summer 2019. Once the new bridge is in operation its additional lanes will boost capacity will help improve journey times as well as safety for drivers in the area.

For more information on companies in this article

Related Content

  • Kronprinsesse Marys Bro bridges Roskilde Fjord
    January 10, 2019
    A BESIX joint venture is giving the royal treatment to the new Kronprinsesse Marys Bro across Roskilde Fjord, writes David Arminas It was announced in September 2016 that Belgian group BESIX, in a joint venture (RBAI) with Italian firm Rizzani de Eccher and Spanish company Acciona Infraestructuras, had been chosen for the €133 million project. The award, by client Vejdirektoratet (Danish Road Directorate), marked the entry of BESIX into the Scandinavian market. Vejdirektoratet praised the winning bid as
  • Financial close for Louisiana’s Calcasieu Bridge
    August 19, 2024
    Sacyr said that the project is the company’s first transportation infrastructure private-public partnership contract in the US and calls for a total of $2.27 billion in construction investment.
  • US$2.1 billion Louisiana bridge deal for partners
    February 2, 2024
    A US$2.1 billion Louisiana bridge deal has been won by Sacyr, Acciona and Plenary Americas.
  • Montreal’s new Champlain Bridge is shaping up for Christmas
    September 10, 2018
    Montreal’s Champlain Bridges - one going up, one coming down, reports David Arminas The importance of the new Champlain Bridge to Montreal and Canada can’t be overstated, given the crumbling nature of the not-so-old original Champlain Bridge. The original steel truss affair across the St Lawrence River and the adjacent St Lawrence Seaway canal is “a lifeline for residents and businesses” in greater Montréal, according to the national Auditor General - the public sector spending watchdog. “It accommodates