Skip to main content

Parsons wins bridge deal in Arkansas

Parsons is heading the project to build the I-40 White River Bridge and approaches in the US state of Arkansas. The contract is to build a 1.92km bridge for the Arkansas State Highway and Transportation Department and Parsons is leading the joint venture that also includes CJ Mahan construction. The new bridge will be constructed some 61m upstream from the existing structure. The existing White River Bridge has four 3.66m-wide lanes and 61m of vertical clearance between piers for commercial navigation
January 17, 2017 Read time: 2 mins
3220 Parsons is heading the project to build the I-40 White River Bridge and approaches in the US state of Arkansas. The contract is to build a 1.92km bridge for the Arkansas State Highway and Transportation Department and Parsons is leading the joint venture that also includes CJ Mahan construction.  The new bridge will be constructed some 61m upstream from the existing structure.  

The existing White River Bridge has four 3.66m-wide lanes and 61m of vertical clearance between piers for commercial navigation vessels. The new bridge will have 18 spans comprising six lanes and will provide 98m of horizontal clearance between the two main river piers and 15.8m of clearance above the White River. It will feature drilled shaft foundations instead of pile foundations as this will reduce costs as well as the time needed for construction. In addition, construction of the new link will include demolition of the old bridge, earthwork, traffic maintenance, and erosion control.

I-40 is an east-west interstate highway connecting Oklahoma and Tennessee with the majority of the route in Arkansas. Construction of the new White River Bridge and its approach roads is scheduled to begin in March 2017 and is expected to be complete in summer 2019. Once the new bridge is in operation its additional lanes will boost capacity will help improve journey times as well as safety for drivers in the area.

For more information on companies in this article

Related Content

  • Korean bridge construction poses challenges
    February 23, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges
  • Korean bridge construction poses challenges
    April 5, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges The new Busan-Geoje crosses from South Korea's second city to its biggest island and is slightly shorter than the 12km of the country's famous Incheon project. In addition the main cable stay bridge for the Busan-Geoje project has a 475m span rather than the 800m of the Incheon central span. However the 8.2km Busan-Geoje project faces perhaps greater technical challenges and also includes a second b
  • Saudi Arabian capital Riyadh benefiting from major transport investment
    September 9, 2013
    Saudi Arabia is undergoing a series of upgrades to its transport network in a bid to improve Traffic flow rates and boost safety - Mike Woof reports. The massive growth in the use of motor transport worldwide since the start of the 20th century has transformed every country on the planet. But perhaps no country has changed more dramatically than Saudi Arabia, the world’s leading oil producer. At the start of the 20th century Saudi Arabia’s population was small and the country had few industries while it is
  • The Cebu–Cordova Link Expressway
    September 19, 2021
    The 8.5km CCLEx, as it is known, will include the longest and tallest bridge in the Philippines when the structure is finished next year