Skip to main content

Parsons wins award for Caldecott Tunnel

Parsons has won an award for its work on the Caldecott Fourth Bore Project. The award comes from Roads & Bridges magazine as the top (US) road project of 2013. Parsons worked as prime consultant on the US$417 million tunnel project, working with Jacobs Associates. The project involved constructing a fourth bore through the Berkeley Hills, near Oakland, California. Parsons was responsible for preliminary engineering and the final design of the tunnel, the operations building, and two associated roadway proje
November 8, 2013 Read time: 2 mins
3220 Parsons has won an award for ITS work on the Caldecott Fourth Bore Project. The award comes from Roads & Bridges magazine as the top (US) road project of 2013. Parsons worked as prime consultant on the US$417 million tunnel project, working with Jacobs Associates. The project involved constructing a fourth bore through the Berkeley Hills, near Oakland, California. Parsons was responsible for preliminary engineering and the final design of the tunnel, the operations building, and two associated roadway projects. The tunnel was excavated using sequential excavation, also known as the New Austrian Tunneling Method.

The Caldecott Fourth Bore Project represents a partnership between the 2410 Federal Highway Administration, the 2451 California Department of Transportation, the 7419 Metropolitan Transportation Commission, the Contra Costa Transportation Authority, and the Alameda County Transportation Commission. When it opens to traffic in late 2013, the Fourth Bore will relieve traffic congestion in the off-peak direction along a heavily traveled section of State Route 24 by permanently dedicating two bores to westbound traffic and two bores to eastbound traffic.  This multimillion-dollar project is one of the largest recipients of 1088 American Recovery and Reinvestment Act funding in the nation, a testament to ITS regional importance.

Related Content

  • Underground routes for highways
    July 20, 2012
    Increasingly, and where possible, roads are being built in tunnels often for environmental reasons, writes Patrick Smith As part of the new M7 motorway development in the southwest of Ireland, the four-lane route crosses the River Shannon near Limerick, before it flows into the Atlantic. Centrepiece of the 10km long Limerick Southern Ring Road is the required tunnelling (675m long), which including the north and south entrance and exit ramps, means it will be 915m long. Completion of the work is planned for
  • Award winning bridge for North Carolina
    November 21, 2019
    A new bridge in the US state of North Carolina has won a key award for excellence – Mike Woof writes
  • Brazil’s Serra do Cafezal Highway
    July 29, 2015
    Brazil's improved Mercosur route will boost capacity and cut travel time - Mauro Nogarin writes. The Régis Bittencourt Highway is one of the main access routes of the Mercosur traffic. It has a length of 400km and connects the main cities of São Paulo and Curitiba, which allows for products to enter from the southeast toward the rest of the southern part of Brazil and later transit to Argentina, Paraguay and Uruguay. Products also flow into Brazil from Mercosur through this major highway. The cost of the hi
  • Florida turnpike contract for Lane
    July 29, 2022
    Lane Construction has been awarded a Florida turnpike contract.