Skip to main content

Parsons heading study team for I-69 bridge

Parsons will head the team handling the feasibility study for the proposed I-69 bridge project in the US. Parsons was awarded the package jointly by the Indiana Department of Transportation (INDOT) and the Kentucky Transportation Cabinet (KYTC) to lead the environmental review as well as to complete the preliminary design work for the I¬ 69 Ohio River Crossing project. The deal will see Parsons evaluate the feasibility and environmental impact of various routes for a new bridge across the Ohio River. Th
November 30, 2016 Read time: 2 mins
3220 Parsons will head the team handling the feasibility study for the proposed I-69 bridge project in the US. Parsons was awarded the package jointly by the 2855 Indiana Department of Transportation (INDOT) and the Kentucky Transportation Cabinet (KYTC) to lead the environmental review as well as to complete the preliminary design work for the I¬ 69 Ohio River Crossing project.

The deal will see Parsons evaluate the feasibility and environmental impact of various routes for a new bridge across the Ohio River. This structure will connect existing sections of the I 69 highway in the two states, the Robert D Orr Highway near Evansville, IN, and the upgraded Edward T Breathitt Pennyrile Parkway south of Henderson, KY. The environmental review and preliminary design should be complete by the end of 2019.

In other efforts to improve and expand I-69, late last year, Indiana opened 43km of new highway between Bloomington and Naval Support Area Crane. Kentucky designated 70km of the Pennyrile Parkway in Henderson, Hopkins, and Webster counties as I 69 by adding interstate highway signs along the route. In addition to the I 69 Ohio River Crossing project, both states plan additional improvements on I 69, including extending it by 77km in Indiana and 85km in Kentucky. The I 69 improvements are expected to boost the economies of both southwestern Indiana and western Kentucky.

Designated by the U.S. Department of Transportation as one of six “Corridors of the Future,” I 69 stretches across eight states from Texas to Michigan, with approximately 1,312km already operational. When complete, it will be a primary north-south artery for the movement of goods and services in the United States.

For more information on companies in this article

Related Content

  • Talks continue for 2025 Gordie Howe opening
    January 18, 2023
    The tolled six-lane cable-stayed bridge over the Detroit River will connect the city of Windsor in the Canadian province of Ontario with Detroit in the neighbouring US state of Michigan.
  • California turns towards a Texas solution for u-turn design
    July 24, 2019
    The first so-called Texas U-Turn in the US state of California has opened as part of the Gerald Desmond Bridge Replacement project at Long Beach. The design enables trucks and other vehicles to make a safe and free-flowing U-turn at the west end of the project at the port access undercrossing, a second tunnel near the intersection of Ocean Boulevard and State Route 47 (SR-47) on Terminal Island. The Texas U-turn - named because it is a common feature at intersections in the state of Texas - enables ve
  • JMT and Parsons get a Nice Bridge contract in the US state of Maryland
    July 7, 2015
    In the US state of Maryland, a joint venture of Johnson, Mirmiran & Thompson (JMT) and Parsons Brinckerhoff has won a contract to replace the Harry W. Nice Memorial Bridge. The Maryland Transportation Authority awarded the $1 billion contract to replace the bridge, also known as the Potomac River Bridge and which was opened in 1940. The tolled 2.7km two-lane continuous truss bridge on US 301 spans the Potomac River between Newburg in Maryland and Dahlgren in the state of Virginia. Construction of the
  • Ohio to spend US$930mn on 10 Turnpike-sensitive highway projects
    September 20, 2013
    The Ohio Turnpike and Infrastructure Commission (OTIC) has approved funding for 10 projects worth a combined US$930 million located in northern Ohio, each within 20 miles of the Turnpike. The projects will be funded using bond proceeds that were the result of Governor Kasich’s Ohio Jobs and Transportation Plan. OTIC conducted a special meeting on 9 September 2013 to hear Turnpike staff analysis of the 12 Transportation Review Advisory Committee (TRAC) projects that were presented to the Commission by th