Skip to main content

Paraguay highway project delayed

Work to improve a major highway connection in Paraguay has been delayed, but will be completed shortly. A consortium, Rutas del Este, is carrying out the work to improve the stretch of Ruta 2 from San Lorenzo to Ypacaraí. The consortium is headed by contractor Sacyr and has been carrying out the work for the PPP deal to upgrade the Ruta 2 and Ruta 7 highways between Ypacarai and Pastoreo.
November 9, 2018 Read time: 1 min

Work to improve a major highway connection in Paraguay has been delayed, but will be completed shortly. A consortium, Rutas del Este, is carrying out the work to improve the stretch of Ruta 2 from San Lorenzo to Ypacaraí. The consortium is headed by contractor 3959 Sacyr and has been carrying out the work for the PPP deal to upgrade the Ruta 2 and Ruta 7 highways between Ypacarai and Pastoreo.

For more information on companies in this article

Related Content

  • Key highway project in Colombia faces delay
    December 2, 2013
    Work on a key stretch of Colombia’s Ruta del Sol highway project is behind schedule, with the route now unlikely to open to traffic before 2017. The 21.6km section of the highway facing these delays will link Villeta and Guaduas in Cundinamarca. A key challenge is technical as the US engineering firm Gall Zeidler Consultants has warned Colombia’s infrastructure agency (ANI) that this section of the route is geologically unstable. The proposed route could be at risk from slippage and will need to be stabilis
  • Colombian highway projects being agreed
    March 22, 2017
    Interest is proving strong in Colombia’s Pamplona-Cucuta 4G motorway project, which is currently undergoing the tender process. The country’s National Infrastructure Agency (ANI) has had three bids so far for the project. The 62km stretch of road will be built in Colombia’s Norte de Santander department. The project is expected to cost in excess of US$515 million. So far ANI’s bids have come from CCA Civil Colombia, the Colombia-based subsidiary of Spanish contractor Sacyr, as well as the consortium Estruct
  • New Paraguay-Brazil bridge being built
    July 1, 2020
    Construction work is now underway on a new Paraguay-Brazil bridge.
  • Paraguay key bridge project is restarting
    January 29, 2024
    A key Paraguay bridge project is restarting.