Skip to main content

Paraguay bridge design work

The Paraguay River bridge design work should be ready shortly.
By MJ Woof May 28, 2020 Read time: 1 min
Design work is in hand for a new bridge spanning the Paraguay River - image © courtesy of © Iakov Filimonov, Dreamstime.com

Design work for a new bridge spanning the Paraguay River should be complete in the next few months. The bridge will connect Asuncion and Chaco'I in Paraguay.

As Chaco'I lies close to the border with Argentina, the bridge will also be an important international link for Paraguay, helping to boost transport and trade between the two nations and developing the local economy.

Building the bridge will cost close to US$134 million, with preparatory works having already commenced. Much of the funding for building the 450m bridge will be supplied by the Inter-American Development Bank (IADB).

A consortium, Consorcio Union, that comprises two Paraguayan companies is in charge of the project and this includes the design work. But the actual building work may be carried out by a Portuguese firm, Construgomes Engenharia.

Related Content

  • Israeli road deal
    March 22, 2012
    The tender has now been published by the Israel National Roads Company for the upgrade to Road No 85, a project expected to cost US$134.2 million (500 million NIS). The work includes widening and building an interchange on Roads No 85, which along with improvements to Road No 65 forms a key component of the Netivei Israel plan.
  • Forming iconic structures
    July 18, 2012
    Specially designed and constructed formwork is being used to create some iconic bridges worldwide The Golden Ears Bridge over the Fraser River will unite the municipalities of Richmond, New Westminister and Delta in the scenic British Columbia province of Canada. The bridge, part of a CAD$800 million (US$670 million) project, is an 'extra dosed' cable stayed bridge, which means the deck will be supported by both cables and the structure itself. This design reduces the overall height of the two towers as req
  • Komarno bridge on schedule despite cost and environmental protests
    July 13, 2018
    Slovakia’s transport minister said he will do everything possible to finish on time a new bridge connecting Komano with the Hungarian town of Komarom. Construction started last year on the €117 million bridge over the Danube River between the Hungarian town of Komarom and the Slovak town of Komarno. Around 85% of the cost of the bridge - designed by Hungarian engineering firm Pont-Terv - will be covered by European Union’s Connecting Europe Facility. Completion is planned for winter 2019. Transport m
  • Komarno bridge on schedule despite cost and environmental protests
    July 13, 2018
    Slovakia’s transport minister said he will do everything possible to finish on time a new bridge connecting Komano with the Hungarian town of Komarom. Construction started last year on the €117 million bridge over the Danube River between the Hungarian town of Komarom and the Slovak town of Komarno. Around 85% of the cost of the bridge - designed by Hungarian engineering firm Pont-Terv - will be covered by European Union’s Connecting Europe Facility. Completion is planned for winter 2019. Transport m