Skip to main content

Paraguay bridge design work

The Paraguay River bridge design work should be ready shortly.
By MJ Woof May 28, 2020 Read time: 1 min
Design work is in hand for a new bridge spanning the Paraguay River - image © courtesy of © Iakov Filimonov, Dreamstime.com

Design work for a new bridge spanning the Paraguay River should be complete in the next few months. The bridge will connect Asuncion and Chaco'I in Paraguay.

As Chaco'I lies close to the border with Argentina, the bridge will also be an important international link for Paraguay, helping to boost transport and trade between the two nations and developing the local economy.

Building the bridge will cost close to US$134 million, with preparatory works having already commenced. Much of the funding for building the 450m bridge will be supplied by the Inter-American Development Bank (IADB).

A consortium, Consorcio Union, that comprises two Paraguayan companies is in charge of the project and this includes the design work. But the actual building work may be carried out by a Portuguese firm, Construgomes Engenharia.

Related Content

  • Tanzania to Burundi road links to be upgraded
    December 7, 2018
    Two roads linking Tanzania with Burundi in East Africa will be upgraded. Construction work will start in 2019. Some US$322 million of funding is being provided by the African Development Bank (AfDB). Upgrades will be carried out on the roads connecting Rumonge with Gitaz as well as Kabingo with Kasulu and Manyovu. An new border post will be constructed.
  • Just stop arguing and build the thing
    December 15, 2017
    The news that the preferred route has been announced for a new road and tunnel link that will bypass the UK’s famous Stonehenge stone circle comes after years of debate. The project is for the construction of a new 13km dual carriageway link and includes a 2.6km stretch of tunnel, which is the subject of some controversy. Because of the archeological importance of the area, the tunnel has been decided as being the best option for the new route. Building a tunnel will allow much of the important archeologi
  • Crash cushion design
    February 13, 2012
    There are key differences in crash cushion design and quality for the United States and European markets. Developments in barrier technologies have followed the varying demands of specific markets, resulting in manufacturers offering different solutions for US and European needs.
  • Delays for Costa Rica projects
    May 28, 2012
    In Costa Rica delays have hit the channelling of a loan provided by the Inter-American Development Bank (IADB) for infrastructure projects. The US$300 million loan granted from the IADB has yet to be invested into infrastructure projects. Some of the key works planned originally include new roads and bridges