Skip to main content

Paraguay bridge design work

The Paraguay River bridge design work should be ready shortly.
By MJ Woof May 28, 2020 Read time: 1 min
Design work is in hand for a new bridge spanning the Paraguay River - image © courtesy of © Iakov Filimonov, Dreamstime.com

Design work for a new bridge spanning the Paraguay River should be complete in the next few months. The bridge will connect Asuncion and Chaco'I in Paraguay.

As Chaco'I lies close to the border with Argentina, the bridge will also be an important international link for Paraguay, helping to boost transport and trade between the two nations and developing the local economy.

Building the bridge will cost close to US$134 million, with preparatory works having already commenced. Much of the funding for building the 450m bridge will be supplied by the Inter-American Development Bank (IADB).

A consortium, Consorcio Union, that comprises two Paraguayan companies is in charge of the project and this includes the design work. But the actual building work may be carried out by a Portuguese firm, Construgomes Engenharia.

Related Content

  • Peru's award winning road construction project
    April 16, 2012
    The South Interoceanic Road is a path of integration and development: it is also a GRAA 2011 Winning Project . On 24 January, 2012 the International Road Federation formally presented a Global Road Achievement Award (GRAA) in. the Programme Management category to Concesionaria Interoceánica Sur Tramos 2 y 3, S.A. for its leadership in the provision of integrated services as part of a large-scale transportation infrastructure programme. IIRSA Sur Concessionaire - Stretches 2 & 3, builds, provides maintenanc
  • Chinese firm for Cameroon highway contract
    February 8, 2024
    A Chinese firm will carry out a key Cameroon highway contract.
  • Construction commencing for Mersey gateway project
    September 15, 2014
    Work is now starting on the road links that will connect to the new Mersey Gateway Bridge, close to the UK city of Liverpool. The first work is being carried out at Junction 12 of the M56 in Runcorn, with workers commencing site clearance at the roundabout where the motorway joins the Weston Point Expressway (A557). This will take around six months to complete, with much of the work being carried out during off-peak traffic times so as to minimise congestion and this portion of the project should be finishe
  • Developments in hybrid vehicles
    February 27, 2012
    There is an array of future vehicle solutions in development - Mike Woof reports. Ever since Henry Ford's Model T showed that the motor car could provide transport for ordinary people rather than being an exclusive toy of the rich, vehicle numbers have exploded. In every country around the world, vehicle ownership continues to grow.