Skip to main content

Paraguay bridge design work

The Paraguay River bridge design work should be ready shortly.
By MJ Woof May 28, 2020 Read time: 1 min
Design work is in hand for a new bridge spanning the Paraguay River - image © courtesy of © Iakov Filimonov, Dreamstime.com

Design work for a new bridge spanning the Paraguay River should be complete in the next few months. The bridge will connect Asuncion and Chaco'I in Paraguay.

As Chaco'I lies close to the border with Argentina, the bridge will also be an important international link for Paraguay, helping to boost transport and trade between the two nations and developing the local economy.

Building the bridge will cost close to US$134 million, with preparatory works having already commenced. Much of the funding for building the 450m bridge will be supplied by the Inter-American Development Bank (IADB).

A consortium, Consorcio Union, that comprises two Paraguayan companies is in charge of the project and this includes the design work. But the actual building work may be carried out by a Portuguese firm, Construgomes Engenharia.

Related Content

  • Earth Day inauguration for US animal crossing
    April 22, 2022
    Construction starts today, Earth Day, on the 67m-long Wallis Annenberg Wildlife Crossing at Liberty Canyon in the US state of California and which will be the biggest in the world .
  • Kenyan key contract being built by Bechtel
    August 9, 2017
    Bechtel has won a major project to build and important highway link in Kenya. This will be the first long stretch of high-speed expressway in Kenya and will connect the capital, Nairobi, with the country’s main port, Mombasa. The project for the 473km connection is being supported with financing from US and UK sources. Once the new route is open to traffic, journeys between Nairobi will take just four hours by road, instead of 10 at present.
  • Bridge spanning Nepal’s Bagmati River open to traffic
    April 3, 2014
    The bridge linking Old Baneshwor and Sinamangal over the Bagmati River in Nepal’s capital Kathmandu has now been officially opened. This was carried out by the former minister for Physical Planning and Transport although the bridge itself had been open to traffic for five months prior to the inauguration. The old bridge had to be closed after one of the piers subsided in September 2009, a common problem for bridges in Nepal. The Nepalese Government has initiated the new bridge in January 2010. There have be
  • Two bridges in Nepal to help power generation increase
    October 11, 2012
    Construction of two vital bridges in Nepal will help increase power generation and offer a return on investment Two bridges are required in Nepal to enable the country to address its current capacity shortfall in electric power generation. Once constructed, they will be the largest single-span truss bridges in Nepal. Construction of the Arun River Bridge at Leguwaghat, Dhankuta, and Sabha Khola Bridge, Sankhuwasabha District, is also required to maximise the rate of return on special programmes under the R