Skip to main content

Panama road project proves controversial

Controversy surrounds proposals to improve a key road link in Panama. The plan is to widen and improve the Panamerican highway stretch in the country’s Panama Oueste Province, between Las Americas bridge and Arraijan. The work is expected to cost in the region of US$335.5 million. However there is concern over the 91ha of forest that will have to be cut down, of which 50ha lies in a national park. Various groups have criticised the Ministry of Public Works for choosing a road alignment that requires forest
October 12, 2018 Read time: 1 min

Controversy surrounds proposals to improve a key road link in Panama. The plan is to widen and improve the Panamerican highway stretch in the country’s Panama Oueste Province, between Las Americas bridge and Arraijan. The work is expected to cost in the region of US$335.5 million. However there is concern over the 91ha of forest that will have to be cut down, of which 50ha lies in a national park. Various groups have criticised the Ministry of Public Works for choosing a road alignment that requires forest to be cut down, saying that other routes could have been considered instead as being more suitable.

Related Content

  • Bridge of international accord from Russia-China
    May 29, 2018
    A new bridge project joining China and Russia is a sign of international accord between the two nations – Mike Woof writes A new bridge spanning what China calls the Heilongjiang River and which is known as the Amur River in Russia, is a clear sign of an important international accord between the two countries. Discussions over the bridge project were first started between China and Russia in the 1980s, with both nations seeing many changes in leadership since that time. But while the political discussion
  • Panama plans road repairs
    March 1, 2012
    Panama is planning a project to repave up to 400km of roads, in a six month.
  • Costa Rica road project delay
    November 29, 2024
    A key Costa Rica road project faces delays and questions.
  • Progression with Bangladesh elevated highway
    June 8, 2016
    Plans are in hand for a radical new 225km raised highway to connect Bangladeshi capital Dhaka with the city of Chittagong. An elevated highway design is required due to the low-lying terrain along the country’s coast where the highway would run, as the area is prone to frequent flooding. However raising the roadway is also boosting the cost of the project substantially. The work is likely to cost in the region of US$8.91 billion according to estimates. As a result, the Bangladesh Government is having had to