Skip to main content

Panama road contract extension for construction firm

Contractor Constructora Meco has been awarded an extension to the package of works it is carrying out in Panama to upgrade the road running through Pedregal, Gonzalillo and Transistmica. The Costa Rican contractor was awarded the extension by Panama’s Ministry of Public Works (MOP). The work involves improvements to an 11km road section that will help improve traffic flow between the east and north of Panama City. The work was originally expected to cost US$97 million but has now increased to $127.8 million
June 8, 2018 Read time: 1 min

Contractor Constructora Meco has been awarded an extension to the package of works it is carrying out in Panama to upgrade the road running through Pedregal, Gonzalillo and Transistmica. The Costa Rican contractor was awarded the extension by Panama’s Ministry of Public Works (MOP). The work involves improvements to an 11km road section that will help improve traffic flow between the east and north of Panama City. The work was originally expected to cost US$97 million but has now increased to $127.8 million. A major factor in the increased pricetag has been the unexpectedly high compensation rates paid for the land.

Related Content

  • A new tolled highway brings change for Austin, Texas
    February 10, 2020
    A new highway section in Austin, Texas marks a major departure for the southern US city
  • Realigning Kenyan bypass to avoid quagmire and ease congestion
    March 22, 2012
    Japanese consultants are planning to realign a Kenyan bypass, as Shem Oirere reports. Japanese consultants are resolving an engineering quagmire involving a 17.5km bypass in Kenya's Coast region. The new design realigning the bypass is underway by Japanese International Cooperation Agency (JICA) consultants. The road is an alternative link from the hinterland to the south coast and to the proposed Dongo Kundu Port. The 23m-wide bypass would also serve to reduce traffic congestion across the Likoni Channel.
  • Realigning Kenyan bypass to avoid quagmire and ease congestion
    March 21, 2012
    Japanese consultants are planning to realign a Kenyan bypass, as Shem Oirere reports. Japanese consultants are resolving an engineering quagmire involving a 17.5km bypass in Kenya's Coast region. The new design realigning the bypass is underway by Japanese International Cooperation Agency (JICA) consultants. The road is an alternative link from the hinterland to the south coast and to the proposed Dongo Kundu Port. The 23m-wide bypass would also serve to reduce traffic congestion across the Likoni Channel t
  • Concrete paving meets demanding airport conditions
    July 11, 2012
    High speed, high quality concrete paving can be achieved in the demanding airport environment using the latest equipment. Minnich Manufacturing has developed a novel dowel pin drilling machine and has successfully tested this equipment at Tyndall Air Force Base in Panama City, Florida. The A-5SCW is a self-propelled, cantilevered machine that features a wireless remote control and is designed to install five dowel pins simultaneously. The control system has been developed by Wisconsin Kar-Tech and uses prov