Skip to main content

Panama bridge project report released

A report has been released regarding the project to build the fourth bridge spanning the Panama Canal. The report concerns the awarding of the design and construction contract and reveals that there may be an increase in building costs over original estimates due to geotechnical requirements. The report also says that such large capital projects should be split into two, one covering feasibility studies and design work and the second for construction and maintenance. The bridge project is being handled by t
October 14, 2019 Read time: 1 min

A report has been released regarding the project to build the fourth bridge spanning the Panama Canal. The report concerns the awarding of the design and construction contract and reveals that there may be an increase in building costs over original estimates due to geotechnical requirements. The report also says that such large capital projects should be split into two, one covering feasibility studies and design work and the second for construction and maintenance. The bridge project is being handled by the Panama Cuarto Puente consortium, comprising China Communications Construction Company (CCCC) and China Harbour Engineering Company (CHEC). The original estimates predicted the construction cost at some US$1.5 billion.

Related Content

  • Bridge design using flow modelling techniques
    February 17, 2012
    SBG has set numerous engineering precedents with its hugely innovative Jamarat Bridge project in Saudi Arabia
  • China Harbor Engineering picks up Brunei’s Muara Besar project
    May 11, 2015
    Brunei has awarded Chinese infrastructure construction company China Harbor Engineering Company (CHEC) the US$204 million Pulau Muara Besar Bridge, Road and Utilities project through an open tender. CHEC reportedly signed the deal with the Brunei Economic Development Board on May 6, according to Chinese media. Pulau Muara Besar is a 955ha island in Brunei Bay, immediately across from Brunei’s largest port town, Muara, on the mainland. The island is undergoing major infrastructure development including
  • New Uruguay-Argentina bridge planned
    February 1, 2016
    Plans for a new bridge link connecting Argentina and Uruguay are being developed. A comprehensive set of feasibility studies for the new bridge is being carried out that covers technical, environmental and financial factors. There are three existing road connections spanning the Uruguay River that link these nations but this new bridge will improve transport links between the two. The feasibility study is costing US1 million but the estimated cost of the bridge construction has not yet been revealed. The fe
  • Pakistan project awarded to partnership
    October 25, 2022
    A major project in Pakistan has been awarded to a partnership.