Skip to main content

Pakistan highway project commencing

Construction work is due to commence on Pakistan’s Hyderabad-Sukkur Motorway. The route will connect Sukkur and Hyderabad and will be 296km in length. This new stretch is costing US$1.53 billion and will form part of the Peshawar-Karachi Motorway (PKM). The plans call for the project to be carried out under the build-operate-transfer (BOT) model, although the details have yet to be finalised.
February 8, 2017 Read time: 1 min
Construction work is due to commence on Pakistan’s Hyderabad-Sukkur Motorway. The route will connect Sukkur and Hyderabad and will be 296km in length. This new stretch is costing US$1.53 billion and will form part of the Peshawar-Karachi Motorway (PKM). The plans call for the project to be carried out under the build-operate-transfer (BOT) model, although the details have yet to be finalised.

Related Content

  • Sichuan’s highway BOT opportunities
    April 24, 2013
    An event has been staged to encourage investment in a number of highway build-operate-transfer (BOT) projects in China's Sichuan province. The Sichuan BOT projects include the US$2.22 billion 90km Pingwu-Guangyuan highway; the $2.612 billion 122km Wanyuan-Bazhong highway; the 72km $1.41 billion Bazhong-Cangxi highway; and the $2.147 billion 122km Cangxi-Mianyang highway
  • Construction resumes for Bolivian tunnel link
    May 30, 2023
    Construction work is resuming for a major Bolivian tunnel link.
  • Algeria developing its Sahara route
    June 2, 2021
    Algeria is developing its section of the Trans-Sahara route.
  • Study for Dallas road development project
    July 14, 2016
    The Texas Department of Transportation (TxDOT) awarded a US$2.75 million contract for a study to develop the corridor along a stretch of Interstate 635 (I-635) in Dallas. The two-year contract is for schematic, environmental and traffic studies for the construction of access roads along the growing section of highway and was awarded to Michael Baker International. As part of the contract, the Michael Baker team will conduct a number of detailed studies in advance of TxDOT’s plans to add more than 53km of