Skip to main content

Pakistan highway project commencing

Construction work is due to commence on Pakistan’s Hyderabad-Sukkur Motorway. The route will connect Sukkur and Hyderabad and will be 296km in length. This new stretch is costing US$1.53 billion and will form part of the Peshawar-Karachi Motorway (PKM). The plans call for the project to be carried out under the build-operate-transfer (BOT) model, although the details have yet to be finalised.
February 8, 2017 Read time: 1 min
Construction work is due to commence on Pakistan’s Hyderabad-Sukkur Motorway. The route will connect Sukkur and Hyderabad and will be 296km in length. This new stretch is costing US$1.53 billion and will form part of the Peshawar-Karachi Motorway (PKM). The plans call for the project to be carried out under the build-operate-transfer (BOT) model, although the details have yet to be finalised.

Related Content

  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.
  • Azerbaijan highway widening project commencing
    August 9, 2018
    Work is now starting on a new highway widening project in Azerbaijan.
  • Laos highway construction proposal
    January 17, 2017
    Plans are being put forward for a 14km highway project in Laos capital Vientiane. The aim of the project would be to help ease the city’s chronic congestion problems. The proposals call for the construction of a six lane highway, carrying three lanes of traffic in either direction. The proposed route runs from Xaysettha district's Lao International Trade Exhibition and Convention Centre (Lao-ITECC) to Xaythany district's Dongmakkhai village, alongside the existing Kaysone Phomvihane Road. The project ha
  • Colombian bridge now complete
    September 29, 2020
    A key Colombian bridge replacement is now complete.