Skip to main content

Oslofjord Tunnel closed for repairs for up to three weeks

The 7km subsea Oslofjord Tunnel in Norway will be closed for up to three weeks after a truck caught fire in the tunnel on May 5. Norwegian media report that a 500m stretch was damaged - tunnel vault, cables, insulation and road surface. The tunnel is equipped with 25 evacuation rooms that can be sealed off from the main tunnel. Each room can provide pressurised space for up to 50 people while a fire is being fought. However, the latest incident has spurred the government to announce that a second tube will
May 12, 2017 Read time: 2 mins
The 7km subsea Oslofjord Tunnel in Norway will be closed for up to three weeks after a truck caught fire in the tunnel on May 5.


Norwegian media report that a 500m stretch was damaged - tunnel vault, cables, insulation and road surface.

The tunnel is equipped with 25 evacuation rooms that can be sealed off from the main tunnel. Each room can provide pressurised space for up to 50 people while a fire is being fought. However, the latest incident has spurred the government to announce that a second tube will be built to hopefully reduce closures and improve safety.

The National Transport Plan has allocated around €476 million for a new tunnel course, media reported.

The tunnel, opened in 2000 after three years of construction, runs from Hurum to Frogn along Norway’s south coast. It dips 134m below sea level with a maximum gradient of 7% and carries three lanes of National Road 23.

The tunnel was flooded and affected by a landslide in 2003 and flooded again in 2008, resulting in closures or part closures of several weeks at a time. Before the latest vehicle fire, there was one in 2006 and one in 2011.

The latest fire prompted to the former head engineer of the Norwegian Public Roads Administration to publically voice concern about safety in the tunnel system, including any proposed new courses. Ove Solheim, a retired civil engineer, told the Oslo-based Aftenposten, Norway’s largest newspaper, that there needed to be three tunnel courses to ensure absolute safety.

He also called for an emergency lane within the tunnel system and an extra lane for slow-moving vehicles. He pointed out that there were 200 temporary closures last year.

Solheim also said that a two-lane bridge was a viable option, but it might cost as much as two new tunnels.

Related Content

  • PPRS: the positive side of structural failures
    March 27, 2018
    You learn from your failures, not your successes. That was the overall message for delegates during the day-two morning session on the impact of engineering structural failures. These lessons are also too often “painful”, said Anne-Marie Leclerq, deputy minister for infrastructure within the ministry of transport for the Canadian province of Quebec. On September 30, 2006, a span of the six-lane Concorde Bridge in Laval, near Montreal, collapsed crushing to death five people and injuring six. Only recently
  • PPRS Nice 2018: maintenance moves mountains
    June 22, 2018
    Strategic maintenance was a major theme at the second Pavement Preservation and Recycling Summit in Nice, France. The world is changing, mobility is changing and so roads must change and adapt for the future.” With this brief statement, Jacques Tavernier opened the second PPRS Summit. “At the same time there is a growing awareness of poor or non-existent maintenance for highways. The question for this conference is how to adapt road maintenance in the face of this challenge,” said Tavernier, in his role as
  • Underground expansion pushes tunnelling market
    June 13, 2012
    Infrastructure investment means that the road tunnel construction sector is healthy due to demand for new links – Mike Woof reports With many emergent nations investing heavily in infrastructure, the tunnelling sector is seeing extensive business at present. Tunnels provide key links in mountainous areas or in congested cities where building roads on the surface may not be practical. In Asia and Latin America, many key road connections are now being built underground to pass challenging terrain or provide
  • Norwegian project awarded
    September 9, 2021
    An important Norwegian project has been awarded.