Skip to main content

Online survey to decide name for Istanbul’s Eurasia Tunnel

The name of Istanbul’s new 14.6km tunnel under the Bosphorus Strait will be chosen form on-line poll run by the federal transport ministry. The US$1.25 billion tunnel will officially open this month, around eight months ahead of schedule, according to the state-run news agency Anadolu Agency. Often referred to as the Eurasian Tunnel, it will shorten a 100-minute vehicle journey between the European and Asian sides of the strait to around 15 minutes. The mega project consisting of a railway and two
December 7, 2016 Read time: 1 min
The name of Istanbul’s new 14.6km tunnel under the Bosphorus Strait will be chosen form on-line poll run by the federal transport ministry.

The US$1.25 billion tunnel will officially open this month, around eight months ahead of schedule, according to the state-run news agency Anadolu Agency.

Often referred to as the Eurasian Tunnel, it will shorten a 100-minute vehicle journey between the European and Asian sides of the strait to around 15 minutes.
 
The mega project consisting of a railway and two tunnels for light vehicles such as cars and minibuses was contracted in 2009 to a joint Turkish-Korean venture later named Eurasian Tunnel Operation Construction and Investment (ATAS).

The tunnel links Kazlicesme on Istanbul’s European side and Goztepe in Asia. Tolls of about $4 for cars and $6 for minibuses will be levied, Anadolu reported.

Related Content

  • State of the art tunnel a conservation triumph
    February 28, 2012
    The opening of a 1.8km tunnel in southern England is designed to ease traffic bottlenecks in an environmentally sensitive area. Patrick Smith reports
  • Construction of Fehmarn Belt Link could start in 2019
    February 27, 2018
    Construction of a Fehmarn Belt Link could start a year from now – more than a year ahead of schedule, according to Danish media reports. The timing was put forward by Holger Schou Rasmussen, chairman of Femernbælt Development, and Kristian Pihl Lorenzen, the Liberal Party spokesman for traffic issues. They reportedly said that a pending environmental court case in Germany that has stalled approval by German authorities won’t hold up construction of the 18km crossing as much as had been feared. As late as
  • JP Autoceste eyes 2020 as completion date for Bosnia’s Corridor 5c
    March 3, 2016
    Around two-thirds of the Corridor 5c motorway project is expected to be completed by 2020, according to the director of the Bosnian motorways company JP Autoceste. Jasmin Buco said that 120km out of 337km of the motorway are complete. The corridor section, to connect Budapest with Ploce port in Croatia, is taking the most time. He said that the cost of the remaining part of the motorway is expected to be around €2.81 billion.
  • Kenya rehabilitates, widens, tolls Northern Corridor
    November 8, 2017
    A massive highway project in Kenya will boost transport for the country as well as its neighbours - Shem Oirere reports. Kenya has commenced the process of rehabilitating, expanding and tolling of 657km of East Africa’s Northern Corridor that is anchored on the Indian Ocean port of Mombasa and which links the gateway with landlocked countries of Uganda, Rwanda, Burundi and parts of eastern Democratic Republic of Congo (DRC).