Skip to main content

Oman's new expressway

Plans are now in hand for Oman's massive new Batinah Expressway project. This 265km expressway is expected to cost US$649.25 million. The project is being divided into phases and should take 36 months to complete.
February 13, 2012 Read time: 1 min
Plans are now in hand for Oman's massive new Batinah Expressway project. This 265km expressway is expected to cost US$649.25 million. The project is being divided into phases and should take 36 months to complete. Engineering consultant Parsons is the project management and design consultant for the 180km section between Sohar and Naseem Garden. The balance of 85km length of the expressway connecting Khatmat Malaha to Sohar will be managed by BOTEK from Turkey. The first 45km package of the expressway starts at Naseem Gardern and ends at Suwaiq. The contractor awarded with the project will be responsible in the building of approximately 220 single multi-cell reinforced concrete box culverts, three wadi bridges ,five overpasses at different places along the expressway, dykes, embankment protections and drainage systems. In sum, the first package consists of the construction of three grade-separated interchanges and a fourth link road connecting the Barka highway to the expressway.

Related Content

  • Flatiron wins Winnipeg interchange project in Canada
    August 5, 2015
    US-based contractor Flatiron has won a US$157 million design and build contract for an interchange in the Canadian city of Winnipeg, in the province of Manitoba. The project, for owner Manitoba Infrastructure and Transportation, will replace the existing loop-ramp interchange for Provincial Trunk Highways 59 and 101. Work includes seven precast girder bridges between 40m and 100 meters in length, one cast-in-place box culvert through-pass, construction of 1.5 million cubic meters of interchange embank
  • Atkins sells stake in London’s M25 ring road
    December 14, 2016
    Infrastructure engineering firm WS Atkins sold its stake in London’s M25 orbital road to a consortium of institutional investors for nearly €79 million (£66.3 million). Atkins, a publicly listed UK company, sold to Edge Orbital Holdings 2 Limited and the deal for its minority stake is expected to be complete by March 2017, the end of the financial year, according to a statement by Atkins. In October, the Edge Orbital consortium picked up Skanska’s 40% stake in Connect Plus, which manages the M25. Skanska so
  • CTB forges ahead with Naylor Denlok pipes under A556 upgrade
    September 30, 2016
    Recent trenchless installation of surface water drainage pipes was used underneath a UK road improvement scheme to allow highway upgrades to proceed unimpeded The A556 Knutsford to Bowdon Improvement Scheme, being undertaken by Costain for its client Highways England, is valued between €197 million and nearly €265 million. The 7.5km section will transform the A556 trunk road between the towns of Knutsford and Bowdon into a modern dual carriageway. Costain will also be making the existing A556 into a single
  • East Africa’s dream of a ‘Silk Road’ in sight
    October 22, 2021
    East Africa’s dream of a ‘Silk Road’ route to boost trade and transport is now in sight