Skip to main content

Oman's new expressway

Plans are now in hand for Oman's massive new Batinah Expressway project. This 265km expressway is expected to cost US$649.25 million. The project is being divided into phases and should take 36 months to complete.
February 13, 2012 Read time: 1 min
Plans are now in hand for Oman's massive new Batinah Expressway project. This 265km expressway is expected to cost US$649.25 million. The project is being divided into phases and should take 36 months to complete. Engineering consultant Parsons is the project management and design consultant for the 180km section between Sohar and Naseem Garden. The balance of 85km length of the expressway connecting Khatmat Malaha to Sohar will be managed by BOTEK from Turkey. The first 45km package of the expressway starts at Naseem Gardern and ends at Suwaiq. The contractor awarded with the project will be responsible in the building of approximately 220 single multi-cell reinforced concrete box culverts, three wadi bridges ,five overpasses at different places along the expressway, dykes, embankment protections and drainage systems. In sum, the first package consists of the construction of three grade-separated interchanges and a fourth link road connecting the Barka highway to the expressway.

Related Content

  • New Bangladesh expressway section to be built
    January 27, 2022
    A new Bangladesh expressway section is to be built in capital Dhaka.
  • Formwork developments in bridge construction
    February 23, 2012
    Major infrastructure projects worldwide are relying on innovative formwork solutions for speed and safety as Patrick Smith reports. The 970m long cable-stayed Golden Ears Bridge crossing the Fraser River in Vancouver, Canada, is the core element of a six-lane, highway project near the Canadian west coast.
  • ARTBA makes awards
    February 29, 2012
    A series of highway and bridge projects across the US have been recognised for their contributions to environmental protection and mitigation.
  • Israeli road deal
    March 22, 2012
    The tender has now been published by the Israel National Roads Company for the upgrade to Road No 85, a project expected to cost US$134.2 million (500 million NIS). The work includes widening and building an interchange on Roads No 85, which along with improvements to Road No 65 forms a key component of the Netivei Israel plan.