Skip to main content

Oman's new expressway

Plans are now in hand for Oman's massive new Batinah Expressway project. This 265km expressway is expected to cost US$649.25 million. The project is being divided into phases and should take 36 months to complete.
February 13, 2012 Read time: 1 min
Plans are now in hand for Oman's massive new Batinah Expressway project. This 265km expressway is expected to cost US$649.25 million. The project is being divided into phases and should take 36 months to complete. Engineering consultant Parsons is the project management and design consultant for the 180km section between Sohar and Naseem Garden. The balance of 85km length of the expressway connecting Khatmat Malaha to Sohar will be managed by BOTEK from Turkey. The first 45km package of the expressway starts at Naseem Gardern and ends at Suwaiq. The contractor awarded with the project will be responsible in the building of approximately 220 single multi-cell reinforced concrete box culverts, three wadi bridges ,five overpasses at different places along the expressway, dykes, embankment protections and drainage systems. In sum, the first package consists of the construction of three grade-separated interchanges and a fourth link road connecting the Barka highway to the expressway.

Related Content

  • Extra work for Ulma on Ireland’s New Ross extradosed bridge
    September 19, 2019
    ULMA has taken part in construction Ireland’s New Ross, the longest extradosed bridge in the world. The €230 million project includes a 14km dual carriageway and a three-tower 900m-long extrados bridge over the Barrow River between Pink Point and Strokestown – to be open in early 2020 – that bypasses the town of New Ross. The extradosed bridge is characterised by its cables set at lower angles, meaning that pylons are shorter in relation to deck span lengths. ULMA was responsible for the transverse s
  • Mott MacDonald’s passage to India
    April 24, 2012
    Mott MacDonald has been appointed design consultant for the proposed Raipur-Bilaspur national highway 200 in India. Part of the National Highways Development Programme Phase IV established by the National Highways Authority of India (NHAI), the new road will connect Raipur in Chhatttisgarh to Chandikohole in Orissa, passing through areas including Bilaspur, Raigarh and Jarsuguda. Costing US$244.2million, the 127km long road is primarily made up of four lanes, with 34km of the highway comprising six lanes. T
  • Mott MacDonald’s passage to India
    June 14, 2012
    Mott MacDonald has been appointed design consultant for the proposed Raipur–Bilaspur national highway 200 in India. Part of the National Highways Development Programme Phase IV, established by the National Highways Authority of India (NHAI), the new road will connect Raipur in Chhatttisgarh to Chandikohole in Orissa, passing through areas including Bilaspur, Raigarh and Jarsuguda. Costing US$244.2million, the 127km long road is primarily made up of four lanes, with 34km of the highway comprising six lanes
  • Bulgaria breaks ground for Martisa River bridge
    August 23, 2023
    The contract was awarded to local engineering firm GBS-Infrastructure Construction in Plovdiv, a subsidiary of the Bulgarian civil engineering group Glavbolgarstroy.