Skip to main content

Oman's new expressway

Plans are now in hand for Oman's massive new Batinah Expressway project. This 265km expressway is expected to cost US$649.25 million. The project is being divided into phases and should take 36 months to complete.
February 13, 2012 Read time: 1 min
Plans are now in hand for Oman's massive new Batinah Expressway project. This 265km expressway is expected to cost US$649.25 million. The project is being divided into phases and should take 36 months to complete. Engineering consultant Parsons is the project management and design consultant for the 180km section between Sohar and Naseem Garden. The balance of 85km length of the expressway connecting Khatmat Malaha to Sohar will be managed by BOTEK from Turkey. The first 45km package of the expressway starts at Naseem Gardern and ends at Suwaiq. The contractor awarded with the project will be responsible in the building of approximately 220 single multi-cell reinforced concrete box culverts, three wadi bridges ,five overpasses at different places along the expressway, dykes, embankment protections and drainage systems. In sum, the first package consists of the construction of three grade-separated interchanges and a fourth link road connecting the Barka highway to the expressway.

Related Content

  • VST used on Portuguese bridge
    February 17, 2012
    PERI says that its new VST heavy-duty shoring tower serves as load-bearing scaffold for the large bridge and civil engineering projects. Each leg on the VST (VARIOKIT Shoring Tower) system can carry a load of around 600kN (the weight of about 60 VW Golf cars or one Leopard-2 tank), and the extremely flexible modular system can be assembled as segmental sections, towers or shoring tower frames for heights up to 40m.
  • Mott Macdonald handling major Hong Kong project
    July 24, 2012
    Engineering firm Mott MacDonald has been commissioned to head the team designing the Hong Kong-Zhuhai-Macau Bridge link road. The Dragages-China Harbour-VSL joint venture appointed Mott MacDonald as lead designer for the 9.4km long viaduct section of the Hong Kong-Zhuhai-Macau Bridge. This US$1.66 (HK$12.9 billion) project is the largest single design and build contract ever awarded in Hong Kong. The bridge will carry a dual three-lane carriageway over the Pearl River Estuary, which is one of the world’s bu
  • Tunnel waterproofing solutions
    February 29, 2012
    Tunnels are the highest value assets on a highway, making their operation, safety and maintenance of paramount importance. Patrick Smith reports
  • LagoonHull still on the cards
    February 7, 2022
    A proposed major river development in Hull would include an immersed road tunnel to connect traffic arriving from Europe with the UK’s motorway network.