Skip to main content

Oman's new expressway

Plans are now in hand for Oman's massive new Batinah Expressway project. This 265km expressway is expected to cost US$649.25 million. The project is being divided into phases and should take 36 months to complete.
February 13, 2012 Read time: 1 min
Plans are now in hand for Oman's massive new Batinah Expressway project. This 265km expressway is expected to cost US$649.25 million. The project is being divided into phases and should take 36 months to complete. Engineering consultant Parsons is the project management and design consultant for the 180km section between Sohar and Naseem Garden. The balance of 85km length of the expressway connecting Khatmat Malaha to Sohar will be managed by BOTEK from Turkey. The first 45km package of the expressway starts at Naseem Gardern and ends at Suwaiq. The contractor awarded with the project will be responsible in the building of approximately 220 single multi-cell reinforced concrete box culverts, three wadi bridges ,five overpasses at different places along the expressway, dykes, embankment protections and drainage systems. In sum, the first package consists of the construction of three grade-separated interchanges and a fourth link road connecting the Barka highway to the expressway.

Related Content

  • Texas highway deal for joint venture
    August 12, 2021
    An important Texas highway project is being carried out by a joint venture.
  • Lagos shortlists for Fourth Mainland Bridge
    December 12, 2022
    A consortium led by Mota-Engil is one of three shortlisted for the Nigerian project.
  • Russian, road, bridge and tunnel projects
    October 4, 2017
    New highway and bridge projects are being planned that will boost connectivity in the Russian Federation. One project lies close to the city of Ufa while another is in the Perm Region. The project to build the new Eastern Exit highway link close to Ufa, capital of the Republic of Bashkortostan, is now expected to cost US$590.1 million, compared with the $503.3 million that was originally anticipated.
  • Doka delivers cantilevering for super-slim piers at Lahntal Bridge
    October 21, 2016
    Doka’s formwork expertise is currently in demand during the construction of one of the busiest motorway viaducts in Germany. The 400m six-lane Lahntal Bridge in Limburg dates from the early 1960s. Every day about 100,000 vehicles cross the bridge that spans the valley of the River Lahn. But traffic loads have increased sharply, so a new bridge is being built sited just a few metres west of the old viaduct. The new Lahntal viaduct will measure a massive 43.5m in width, enabling eight lanes plus hard shoul