Skip to main content

Odisha state of India’s huge national highways upgrade

The Indian state of Odisha is to see a total of 2,370km of its national highways (NH) upgraded to four and six-lanes under Phases I to V of the National Highway Development Project. Phase-I of the project has already been completed, involving the four-laning of 520km of NH. Around 490km (Phase II) are still under construction for US$ 770.77 million (INR 45.7 billion), and are expected to be completed by March 2015. These include the four-lane Bhubaneswar-Puri, four-lane Sambalapur-Bargarh, four-lane Panikoi
June 13, 2014 Read time: 1 min
The Indian state of Odisha is to see a total of 2,370km of its national highways (NH) upgraded to four and six-lanes under Phases I to V of the National Highway Development Project. Phase-I of the project has already been completed, involving the four-laning of 520km of NH. Around 490km (Phase II) are still under construction for US$ 770.77 million (INR 45.7 billion), and are expected to be completed by March 2015. These include the four-lane Bhubaneswar-Puri, four-lane Sambalapur-Bargarh, four-lane Panikoili-Keionjhar-Rimuli, four-lane Rimuli-Roxy-Rajamunda, and six-lane Bhubaneswar-Chandikhol NHs.

Meanwhile, for Phases III, IV, and V, which are expected to begin soon, the upgrade involves around 1,370km of the state’s NHs. This is expected to cost around $2.19 billion (INR 130 billion) in total. These include the six-lane Chandikhol-Paradeep, Bhubaneswar-Ichhapuram, and Balasore-Chandikhol, along with four-lane Baharagora-Sambalapur road, four-lane Balasore-Baripada-Jharapokaria, four-lane Chandikhol-Duburi-Talcher, four-lane Birmitrapur-Barkot, four-lane Angul-Sambalpur, and the four-lane Cuttack-Angul NH.

Related Content

  • Mott MacDonald’s passage to India
    April 24, 2012
    Mott MacDonald has been appointed design consultant for the proposed Raipur-Bilaspur national highway 200 in India. Part of the National Highways Development Programme Phase IV established by the National Highways Authority of India (NHAI), the new road will connect Raipur in Chhatttisgarh to Chandikohole in Orissa, passing through areas including Bilaspur, Raigarh and Jarsuguda. Costing US$244.2million, the 127km long road is primarily made up of four lanes, with 34km of the highway comprising six lanes. T
  • Mott MacDonald’s passage to India
    June 14, 2012
    Mott MacDonald has been appointed design consultant for the proposed Raipur–Bilaspur national highway 200 in India. Part of the National Highways Development Programme Phase IV, established by the National Highways Authority of India (NHAI), the new road will connect Raipur in Chhatttisgarh to Chandikohole in Orissa, passing through areas including Bilaspur, Raigarh and Jarsuguda. Costing US$244.2million, the 127km long road is primarily made up of four lanes, with 34km of the highway comprising six lanes
  • Bulgaria plans for operating road infrastructure
    February 21, 2012
    There is a lot of work to do on Bulgarian roads, but the government has plans to increase the length of highways built each year as Krasimir Krastanov reports. Bulgarian roads with a pavement make up 98.4% of all the country's roads, while 92.5% of them have an asphalt surface and 82.8% of them are able to carry 10tonnes/axle.
  • Bulgaria: back on track?
    July 23, 2012
    Several important Bulgarian road projects are expected to gain momentum over the coming weeks, a welcome boost for a sector that has been beset by delays in the past. In mid-September, the National Road Infrastructure Agency (NRIA) announced that it would soon be declaring new tenders for the construction of two key road projects worth a total of US$94 million (approximately €68.8 million). One section will link the south-eastern city of Kardzhali to Podkova, near the Greek border: the second will connect t