Skip to main content

Odebrecht may exit Peru contracts

Brazilian contractor Odebrecht may withdraw from its current contracts in Peru. The firm had planned to continue operating in Peru but is now considering withdrawing. Odebrecht has hit a series of troubles in Peru due to the complex political situation as well as allegations over improper business practices. The firm is looking to sell off the contracts that it holds in Peru at present and has already dispensed with some operations in the country.
March 9, 2017 Read time: 1 min
Brazilian contractor 1305 Odebrecht may withdraw from its current contracts in Peru. The firm had planned to continue operating in Peru but is now considering withdrawing. Odebrecht has hit a series of troubles in Peru due to the complex political situation as well as allegations over improper business practices. The firm is looking to sell off the contracts that it holds in Peru at present and has already dispensed with some operations in the country.

For more information on companies in this article

Related Content

  • Road safety gains were not as marked in 2011 as in 2010 according to the new IRTAD report
    May 2, 2012
    The International Transport Forum has released its IRTAD Road Safety Annual Report 2011, which reveals road safety improvements were not as marked in 2011 as 2010.
  • Superlative formwork’s global appeal
    April 25, 2013
    The latest formwork solutions are enabling some tough bridge-building projects to be delivered in South America and Europe, while the world’s largest construction equipment show is seeing the merits of other cutting-edge formwork. Guy Woodford reports. Taking a road and rail link across one of South America’s largest rivers, together with its swamps and floodplain, calls for a new crossing of superlative dimensions. Two 135.5m pylons for the third bridge across the Orinoco River in Venezuela are taking shap
  • A bridge of hope?
    July 18, 2012
    As Russia prepares for a major Asia Pacific conference in nearly four years' time, the economic climate is felt in other countries in the region. Patrick Smith reports AUS$1 billion-plus suspension bridge is to be built to link the city of Vladivostok in the far east of Russia and Russky Island. Russia's President Dmitry Medvedev has signed an instruction for construction of the 3,150m long bridge, which is intended to provide access to the 24th Asia Pacific Economic Cooperation (APEC) summit, to be held o
  • Delays blight Brazil’s highway programme
    August 4, 2016
    Around 130 road projects are facing delays in Brazil, according to a data from Brazil's national land transport association ANTT. A report in the newspaper O Estado de Paulo noted that many delays are caused by problems with environmental licences and expropriations, as well as a decrease in road traffic due to the economic crisis. Among projects that were meant to have been completed are those by concession holders Rota do Oeste for the Via 040, Concebra for the Eco 101 and MSVia and Galvão for BR-15