Skip to main content

Odebrecht may exit Peru contracts

Brazilian contractor Odebrecht may withdraw from its current contracts in Peru. The firm had planned to continue operating in Peru but is now considering withdrawing. Odebrecht has hit a series of troubles in Peru due to the complex political situation as well as allegations over improper business practices. The firm is looking to sell off the contracts that it holds in Peru at present and has already dispensed with some operations in the country.
March 9, 2017 Read time: 1 min
Brazilian contractor 1305 Odebrecht may withdraw from its current contracts in Peru. The firm had planned to continue operating in Peru but is now considering withdrawing. Odebrecht has hit a series of troubles in Peru due to the complex political situation as well as allegations over improper business practices. The firm is looking to sell off the contracts that it holds in Peru at present and has already dispensed with some operations in the country.

For more information on companies in this article

Related Content

  • Chinese construction equipment manufacturers increasing export focus
    December 2, 2013
    Chinese firms are growing their expertise in terms of products and international sales – Mike Woof reports China’s major off-highway construction equipment manufacturers have grown in a relatively short period and now number amongst the largest players in the sector. Some of the key firms are looking to boost exports and are providing tough competition, particularly in the emergent markets. Best known for its wheeled loaders, LiuGong has been developing its excavator range, with production of the E
  • Looking ahead for Power Curbers
    September 26, 2023
    Power Curbers president Stephen Bullock discussed business trends with Mike Woof
  • Paruvian road concession package cancelled
    April 26, 2019
    The concession package for Peru’s Vía Expresa Sur road project is being cancelled. The deal was originally awarded to the Peruvian company, Grana y Montero (GyM). However the involvement of Brazilian firm Odebrecht in the project have resulted in the deal being cancelled. Odebrecht has been linked to string of corruption scandals. The tender process for the 5km road section will be reopened as a result. The project is intended to cut journey times in Lima, with the work expected to cost US$200 million.
  • Peru’s Oyón -Ambo Highway presents challenges
    August 30, 2022
    Peru’s Oyón-Ambo highway project represents a landmark in construction for the country, while facing significant technical challenges – Paula Chapple, editor of Carreteras Pan-Americana (CPA), writes