Skip to main content

Norwegian tunnels needs safety improvements

Investigations into tunnel safety in Norway have revealed that there are 148 requiring safety upgrades. The 148 tunnels do not meet current EU safety requirements. The EU's road tunnel safety directive was introduced in 2007 and the deadline for the work to be carried out is April 1st, 2019. The necessary upgrade is estimated to cost €873.82 million.
August 17, 2015 Read time: 1 min
Investigations into tunnel safety in Norway have revealed that there are 148 requiring safety upgrades. The 148 tunnels do not meet current EU safety requirements. The EU's road tunnel safety directive was introduced in 2007 and the deadline for the work to be carried out is April 1st, 2019. The necessary upgrade is estimated to cost €873.82 million.

A risk analysis for tunnel fires presented by the Directorate for Civil Protection and Emergency Planning (Direktoratet for samfunnssikkerhet og beredskap) in 2014 reveals that that there have been an average of 21 fires/year in Norwegian tunnels during the last eight years. Luckily, most of the fires are small with limited consequences. The analysis, involving 67 tunnels, shows that heavy vehicles were involved in seven out of 12 fires.

Related Content

  • GRAA WINNER PROFILE: Dubai Traffic Accident Blackspot System Analysis
    June 2, 2020
    Dubai’s Road and Transport Authority’s (RTA) vision is “Safe and Smooth Transport for all”. With this in mind, it initiated a special project, together with an international consultant, to further improve traffic safety on its roads by enhancing the methods of treatment of blackspot locations based on best international practice.
  • Winning formula for formwork
    July 19, 2012
    An unusual application of formwork took place recently in France, while formwork using one particular engineering construction kit was used for the first time in Poland. Guy Woodford reports An 80m long wild game underpass is an innovative feature of the Route Nationale 88 (RN 88) expansion in south-west France. For construction of the arched underpass tunnel, a PERI tunnel formwork carriage using VARIOKIT engineering construction kit was used. Thanks to the equipment’s easy handling, along with pre-assembl
  • Road safety improvement for France
    February 14, 2022
    France is benefiting from a road safety improvement.