Skip to main content

Norwegian tunnel incident provokes criticism

Controversy has arisen with regard to a Norwegian tunnel incident in 2013. A fire broke out in the Gudvanga Tunnel and resulted in 67 vehicle occupants being trapped, with 28 having to receive treatment for smoke inhalation. Norway’s Accident Investigation Board (Statens havarikommisjon) has criticised the National Road Administration (Statens vegvesen) over the incident. According to Statens havarikommisjon, there was insufficient information provided to those people in the tunnel at the time of the incide
March 16, 2015 Read time: 1 min
RSSControversy has arisen with regard to a Norwegian tunnel incident in 2013. A fire broke out in the Gudvanga Tunnel and resulted in 67 vehicle occupants being trapped, with 28 having to receive treatment for smoke inhalation. Norway’s Accident Investigation Board (Statens havarikommisjon) has criticised the National Road Administration (1208 Statens vegvesen) over the incident. According to Statens havarikommisjon, there was insufficient information provided to those people in the tunnel at the time of the incident. There was also inadequate technology for counting the number of vehicles in the tunnel as well as other technical shortcomings.

For more information on companies in this article

Related Content

  • Avalanche safety measures for Norway roads
    December 6, 2023
    Avalanche protection measures for Norway roads will be hugely expensive.
  • Temporary bridges after Tretten collapse
    August 22, 2022
    The 150m-long, 10m-wide Tretten Bridge - only a decade old - broke in two, collapsing into the river stranding two vehicles and their occupants.
  • Oslofjord Tunnel closed for repairs for up to three weeks
    May 12, 2017
    The 7km subsea Oslofjord Tunnel in Norway will be closed for up to three weeks after a truck caught fire in the tunnel on May 5. Norwegian media report that a 500m stretch was damaged - tunnel vault, cables, insulation and road surface. The tunnel is equipped with 25 evacuation rooms that can be sealed off from the main tunnel. Each room can provide pressurised space for up to 50 people while a fire is being fought. However, the latest incident has spurred the government to announce that a second tube will
  • Three offers for major Norwegian road and rail project
    April 24, 2012
    Three firms remain in the competition for the E6-Dovrebanen road and railway construction project in Norway. The project will run between Brøhaug and Strandlykkja in Eidsvoll and Stange in the east of the country. Veidekke and Hochtief Solutions have made a joint offer of US$276.1milion (NOK1.57billion); NCC and Alipne JV have tabled a bid of around $324.4million (NOK1.84billion); and AF Gruppen have offered $387.9million (NOK2.2billion). A fourth offer is reported to have been rejected by the national road