Skip to main content

Norwegian tunnel incident provokes criticism

Controversy has arisen with regard to a Norwegian tunnel incident in 2013. A fire broke out in the Gudvanga Tunnel and resulted in 67 vehicle occupants being trapped, with 28 having to receive treatment for smoke inhalation. Norway’s Accident Investigation Board (Statens havarikommisjon) has criticised the National Road Administration (Statens vegvesen) over the incident. According to Statens havarikommisjon, there was insufficient information provided to those people in the tunnel at the time of the incide
March 16, 2015 Read time: 1 min
RSSControversy has arisen with regard to a Norwegian tunnel incident in 2013. A fire broke out in the Gudvanga Tunnel and resulted in 67 vehicle occupants being trapped, with 28 having to receive treatment for smoke inhalation. Norway’s Accident Investigation Board (Statens havarikommisjon) has criticised the National Road Administration (1208 Statens vegvesen) over the incident. According to Statens havarikommisjon, there was insufficient information provided to those people in the tunnel at the time of the incident. There was also inadequate technology for counting the number of vehicles in the tunnel as well as other technical shortcomings.

For more information on companies in this article

Related Content

  • Norway considers speed limit hike to 120kph for some motorways
    June 21, 2019
    Raising the motorway speed limit in Norway to 120kph could mean four deaths annually, according to research by the Norwegian Public Roads Administration (Statens vegvesen). It could also cost up to €504 million to build or upgrade 460km of motorways to withstand the wear and tear caused by having a 120kph limit. State Secretary Tommy Skjervold said that the government will analyse the research before making a final decision about raising or not the speed limit on some motorways. Norway has some of
  • Tunnel inspections reveal safety compliance need
    April 10, 2012
    Results show the state of Europe's tunnel infrastructure at its 'most sublime and most depressing quality' as Patrick Smith reports
  • Norway drops tender plans for second Sotra fixed link
    February 18, 2019
    Statens Vegvesen, the Norwegian Road Administration, has cancelled tender plans for a new Sotra fixed link project that were scheduled for the spring. Jon Georg Dale, minister of transport, recently told the Norwegian Parliament that the geology near Lake Storavatnet along the route of the project, of which the second bridge would be a part, has caused concern among planners. Also, reconstruction of a high-voltage power cable has come under questions. Helge Eidsnes, a regional manager of Statens Vegve
  • Switzerland’s new tunnel bore being built
    April 19, 2018
    A major new road tunnel project is being constructed in Switzerland – Mike Woof writes Construction work is now underway in Switzerland for the new Belchen Tunnel bore, a project that has resulted from the country’s long-term infrastructure planning. The building of this latest tunnel is important for Switzerland economically as it will deliver an upgraded link for a major transport infrastructure connection. When it is complete, the tunnel will form part of the vital A2 route between Basel, in the north