Skip to main content

Norway’s landmark tunnel project

The Danish consultant Cowi is working on a study for Norway’s Rogfast Tunnel, which will be the world's longest and deepest tunnel. The 25km tunnel is planned to open to traffic in 2021. It will cost some €1.08 billion to construct. Cowi has landed contracts for preliminary studies but is also keen to take on a portion of detailed planning.
June 26, 2012 Read time: 1 min
The Danish consultant 2349 COWI is working on a study for Norway’s Rogfast Tunnel, which will be the world's longest and deepest tunnel. The 25km tunnel is planned to open to traffic in 2021. It will cost some €1.08 billion to construct. Cowi has landed contracts for preliminary studies but is also keen to take on a portion of detailed planning.

For more information on companies in this article

Related Content

  • Panama road projects underway
    November 10, 2017
    A series of major road projects is being carried out in Panama. The Santiago-David road is being upgraded at present. The work has been split into five sections, with the entire project expected to cost US$1.08 billion. The plans are now being drawn up for the 40km section connecting San Juan and La Pita. This stretch of the project will cost $218.26 million to carry out.
  • Norway's tunnel improvements
    March 2, 2012
    Tougher legislation on tunnel safety means that Norway will have to invest heavily in upgrading underground road links.
  • South Korea road tunnel project
    May 31, 2023
    A challenging South Korean road tunnel project is being proposed.
  • Denmark set to appoint preferred bidder for Fehmarnbelt link
    March 14, 2016
    The Danish political parties behind the Fehmarnbelt link have mandated Femern A/S to appoint preferred bidders for the main tunnel work in order to enter into conditional contracts no later than mid-May. Femern A/S is the Danish government-owned company managing the Fehmarn Belt immersed tunnel project between Denmark and Germany. The project was approved by the Danish parliament in April last year. It is supposed to be built, owned - apart from the German land works - and operated by Femern A/S, a su