Skip to main content

Norway’s fire-damaged Skatestraum tunnel to remain closed until 2016

Repair costs for the fire-ravaged undersea Skatestraum tunnel in Bremanger have risen to nearly US$4.7 million, according to Norwegian media reports. Repairs will run into next year when the tunnel, on Norway’s southern North Sea coast, will re-open, although no date was given, the Norwegian media outlet E24 said. The tunnel, nearly 2km long, was opened only in 2002 at a cost of nearly $39 million. No one was injured in the accident when the tunnel was severely damaged by fire on July 15. A tanker
August 20, 2015 Read time: 2 mins
Repair costs for the fire-ravaged undersea Skatestraum tunnel in Bremanger have risen to nearly US$4.7 million, according to Norwegian media reports.

Repairs will run into next year when the tunnel, on Norway’s southern North Sea coast, will re-open, although no date was given, the Norwegian media outlet E24 said.

The tunnel, nearly 2km long, was opened only in 2002 at a cost of nearly $39 million.

No one was injured in the accident when the tunnel was severely damaged by fire on July 15. A tanker truck carrying 16,000 litres of gasoline crashed and its leaking fuel caught ignited.

The driver reportedly managed to stop and turn around vehicles entering the tunnel. He later said that he experienced a brake failure in the deepest part of the tunnel, at 91m below sea level.

The Skatestraum Tunnel runs between the islands of Rugsundøya and Bremangerlandet in Bremanger Municipality.

Related Content

  • Zipping up road lanes
    September 28, 2018
    QMB has a Lindsay Road Zipper on duty near Montreal. World Highways deputy editor David Arminas climbed aboard As vice president of Canadian barrier specialist QMB, based in Laval, Quebec, Marc-Andre Seguin is sanguine about the future for moveable barriers. On the one hand, it looks good. The oft-stated advantage of moveable barriers is that the systems are cheaper to install than adding a lane or two to a highway or bridge. Directional changes to lanes can boost volume on a road without disrupting tra
  • Tanami Road to be sealed for 314km
    May 24, 2022
    Sealing part of the 1,077km Tanami Road in Australia’s outback could transform local farming.
  • Fehmarn Belt Fixed Link could open by 2025 at earliest
    November 27, 2015
    The ambitious Fehmarn Belt Fixed Link, connecting Denmark and Germany, will open in 2025 at the earliest, according to the Danish finance ministry. Femern A/S, the Danish government-owned company managing the project, confirmed the note from the government. It also said the ministry still has financial concerns over the deal to build an immersed tunnel connecting the towns of Rødby in Denmark’s southern Zealand with Puttgarden in northern Germany. Of particular is the time for a construction company t
  • Warm asphalt is a hot topic
    June 12, 2012
    Lower temperature mixes – a key advance in bitumen technology - Kristina Smith reports Warm and cold mix asphalts were not on the original agenda for this year’s Eurasphalt & Eurobitume Congress, being held in Istanbul in June. But when the organisers took a look through the papers submitted for their sustainability-themed event, they realised that this is one of the industry’s hottest topics. “We hadn’t quite anticipated the high level of research in this area,” says E&E’s technical programme committee c