Skip to main content

Norway’s fire-damaged Skatestraum tunnel to remain closed until 2016

Repair costs for the fire-ravaged undersea Skatestraum tunnel in Bremanger have risen to nearly US$4.7 million, according to Norwegian media reports. Repairs will run into next year when the tunnel, on Norway’s southern North Sea coast, will re-open, although no date was given, the Norwegian media outlet E24 said. The tunnel, nearly 2km long, was opened only in 2002 at a cost of nearly $39 million. No one was injured in the accident when the tunnel was severely damaged by fire on July 15. A tanker
August 20, 2015 Read time: 2 mins
Repair costs for the fire-ravaged undersea Skatestraum tunnel in Bremanger have risen to nearly US$4.7 million, according to Norwegian media reports.

Repairs will run into next year when the tunnel, on Norway’s southern North Sea coast, will re-open, although no date was given, the Norwegian media outlet E24 said.

The tunnel, nearly 2km long, was opened only in 2002 at a cost of nearly $39 million.

No one was injured in the accident when the tunnel was severely damaged by fire on July 15. A tanker truck carrying 16,000 litres of gasoline crashed and its leaking fuel caught ignited.

The driver reportedly managed to stop and turn around vehicles entering the tunnel. He later said that he experienced a brake failure in the deepest part of the tunnel, at 91m below sea level.

The Skatestraum Tunnel runs between the islands of Rugsundøya and Bremangerlandet in Bremanger Municipality.

Related Content

  • Slovakia: early 2017 restart for work on the Cebrat Tunnel
    May 27, 2016
    Roman Brecely, Slovakia’s transport minister, has said that construction of the 2km long motorway tunnel Cebrat near Ruzomberok could be resumed at the beginning of 2017. But the cost is expected to increase by around €100 million. He added that the government likely will seek European Union funding. Construction was halted a year ago over concerns about the possibility of landslides and other geological issues. For this reason, the tunnel route may alter and be an additional 1.5km longer. The tunn
  • Briefly, and to the point
    April 10, 2012
    Duplex A86 tunnel. The low risk found for driving through the tunnel is primarily due to the low volume of traffic of around 11,000 vehicles/day and the ban on HGVs and the transport of hazardous goods.
  • Volvo machines help construct new Norwegian tunnels
    January 12, 2015
    Close to Larvik in Norway’s Vestfold County and around 80km south of Drammen, two tunnels are currently under construction as part of a state-funded infrastructure development programme. The project, which began earlier this year, comprises 7km of four lane highway – part of the E18 major route – linking the towns of Bommestad and Sky. This includes the new Larvik and Matineå tunnels, which will span 2.8 and 1.3km respectively. Worth €187 million, this project was awarded to Skanska Norway, the second la
  • Bertha readies for more Seattle SR99 Alaskan Way Viaduct tunnel work
    July 27, 2015
    Bertha, one of the world’s largest tunnelling machines will resume work underneath the US city of Seattle in November, nearly two years after breaking down. Bertha, at 17.4m diameter, began her journey in July 2013. She was boring a path to relocate a 3.2km stretch of the elevated State Route 99 Alaskan Way Viaduct, built between 1949 and 1953 and which carries around 100,000 vehicles daily. The elevated section will be moved underground allowing the creation of public space along Seattle’s downtown w