Skip to main content

Norway’s fire-damaged Skatestraum tunnel to remain closed until 2016

Repair costs for the fire-ravaged undersea Skatestraum tunnel in Bremanger have risen to nearly US$4.7 million, according to Norwegian media reports. Repairs will run into next year when the tunnel, on Norway’s southern North Sea coast, will re-open, although no date was given, the Norwegian media outlet E24 said. The tunnel, nearly 2km long, was opened only in 2002 at a cost of nearly $39 million. No one was injured in the accident when the tunnel was severely damaged by fire on July 15. A tanker
August 20, 2015 Read time: 2 mins
Repair costs for the fire-ravaged undersea Skatestraum tunnel in Bremanger have risen to nearly US$4.7 million, according to Norwegian media reports.

Repairs will run into next year when the tunnel, on Norway’s southern North Sea coast, will re-open, although no date was given, the Norwegian media outlet E24 said.

The tunnel, nearly 2km long, was opened only in 2002 at a cost of nearly $39 million.

No one was injured in the accident when the tunnel was severely damaged by fire on July 15. A tanker truck carrying 16,000 litres of gasoline crashed and its leaking fuel caught ignited.

The driver reportedly managed to stop and turn around vehicles entering the tunnel. He later said that he experienced a brake failure in the deepest part of the tunnel, at 91m below sea level.

The Skatestraum Tunnel runs between the islands of Rugsundøya and Bremangerlandet in Bremanger Municipality.

Related Content

  • Norway’s E18 Lysaker-to-Ramstadsletta project faces funding issue
    December 20, 2018
    A lack of financing is jeopardising construction of the new E18 highway between Lysaker and Asker on the outskirts of Oslo. Media reports say that the Norwegian Road Administration (Statens Vegvesen) has received no funding for the project that is scheduled to start next year. The first phase of the project, between Lysaker and Ramstadsletta, has been scheduled for 2019-2024. Around 90,000 vehicles use the existing E18 road, a local thoroughfare. The new E18 will include cycle paths, pedestrian ways a
  • Norway's bridge meets tough environmental targets
    May 2, 2012
    One of the world's longest bridges is being built in Norway – for traffic volumes of just 2,000 cars/day reports Adrian Greeman. The stunning landscape of the long sea fjords in Norway is one of its glories, attracting thousands of tourists every summer. But the high mountains and deep sea inlets are also one of the great obstacles to transport and development.
  • Norway's bridge meets tough environmental targets
    February 27, 2012
    One of the world's longest bridges is being built in Norway – for traffic volumes of just 2,000 cars/day reports Adrian Greeman. The stunning landscape of the long sea fjords in Norway is one of its glories, attracting thousands of tourists every summer. But the high mountains and deep sea inlets are also one of the great obstacles to transport and development.
  • UK’s M6 tolled motorway for sale
    June 21, 2016
    For sale: one UK toll motorway along with operating business. Well maintained. Price negotiable. David Arminas looks at what is on offer As if right on cue, a French articulated truck starts to back up along the hard shoulder at an exit area of M6toll. The manoeuvring is watched from an office inside the nearby M6toll headquarters. Inside, Andy Pearson, chief executive of M6toll, glances over his shoulder and interrupts his presentation to World Highways. “He’s probably missed the dedicated wide-load