Skip to main content

Norway mulls new routes across the vast Hardangervidda plateau

Norway is considering proposals for another route across over the vast Hardangervidda, one of Europe’s largest plateaux and most of which is a national park. The Norwegian Road Administration (Statens Vegvesen) said one proposal would incorporate a 6km tunnel at a cost more than €216 million, according to a report the Nationen newspaper.
November 2, 2015 Read time: 1 min
Norway is considering proposals for another route across over the vast Hardangervidda, one of Europe’s largest plateaux and most of which is a national park.

The Norwegian Road Administration (1208 Statens Vegvesen) said one proposal would incorporate a 6km tunnel at a cost more than €216 million, according to a report the Nationen newspaper.

One of Norway’s most scenic tourist routes runs across the plateau, the the east-west Riksvei 7 – National Route 7 that includes a new suspension bridge, Hardangerbrua. The total N7, around 388km long, is one of several preferred routes between Norway’s largest two cities, the capital Oslo and Bergen, to the west over mountainous terrain.

The 69km tourist section of the N7 follows the Eidfjorden before crossing the fjord on the Hardanger Bridge which opened in 2013 after four years of construction and replaced a ferry service. The Hardangerbrua is 1.38km long and its single span is 1.31km. %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 2429 0 oLinkInternal World highways reported Norway's bridge meets tough environmental targets false /sections/key-projects/features/norways-bridge-meets-tough-environmental-targets/ true false%> on the bridge’s construction in December 2011.

The N7 road continues through the Vallavik Tunnel before reaching its terminus at the village of Granvin. The tourist section has seen heavier use after a severe fire in July closed the Skatestraum tunnel on the E16, a preferred route for commercial traffic.

Repairs to the 2km Skatestraum tunnel will run into next year, the Norwegian media outlet E24 said in August. The tunnel was opened only in 2002.

No one was injured when a tanker truck carrying 16,000 litres of gasoline crashed and its leaking fuel caught ignited.

For more information on companies in this article

Related Content

  • Chinese inventor puts together vacuum cleaner-size petrol car
    December 15, 2014
    Traffic congestion and the cost of running a car have been pushing Chinese car manufacturers to think small, especially for electric vehicles. Electric scooter and motorcycle have long been popular and in the past several years more and more small electric cars are appearing on crowded urban roads One popular three-wheel electric vehicle has a large retractable bubble top, making it look like a futuristic car from a low-budget 1950s Hollywood movie. It may have a top speed of only 30kph, as the BBC report
  • Testing and striping underway for Seattle’s Alaskan Way tunnel
    August 31, 2018
    Crews have been working flat out on the Alaskan Way Tunnel in Seattle to install and test thousands of components and 90 interconnected systems. The client, Washing State Department of Transportation, said that Seattle Tunnel Partners began installation inside the double-deck State Route 99 tunnel in March after crews completed construction of the upper and lower roadways. STP said that testing could be complete by as early as late September and the tunnel could open as soon as this fall after an ap
  • Norway's bridge meets tough environmental targets
    May 2, 2012
    One of the world's longest bridges is being built in Norway – for traffic volumes of just 2,000 cars/day reports Adrian Greeman. The stunning landscape of the long sea fjords in Norway is one of its glories, attracting thousands of tourists every summer. But the high mountains and deep sea inlets are also one of the great obstacles to transport and development.
  • Norway's bridge meets tough environmental targets
    February 27, 2012
    One of the world's longest bridges is being built in Norway – for traffic volumes of just 2,000 cars/day reports Adrian Greeman. The stunning landscape of the long sea fjords in Norway is one of its glories, attracting thousands of tourists every summer. But the high mountains and deep sea inlets are also one of the great obstacles to transport and development.