Skip to main content

Norway mega-project contract for Fugro

The largest road project in Norway’s history has seen Fugro win a second major contract from the Norwegian Public Roads Administration (NPRA). The work on the E39 Coastal Highway is for the construction of a 1,100km route from Kristiansand in the south to Trondheim in central Norway. This project is expected cost around €34.4 billion (NOK 340 billion).
December 20, 2017 Read time: 2 mins
The new coastal route will improve transport for Norway. E39 Orthomap Courtesy of Norwegian Public Roads Administration (NPRA)
The largest road project in Norway’s history has seen 6202 Fugro win a second major contract from the Norwegian Public Roads Administration (NPRA). The work on the E39 Coastal Highway is for the construction of a 1,100km route from Kristiansand in the south to Trondheim in central Norway. This project is expected cost around €34.4 billion (NOK 340 billion).

Fugro is set to begin a year-long contract, valued at approximately €7.7 million (NOK 76 million), to carry out seabed investigations in four fjord locations where vast engineering projects are planned. The fjords - Vartdalsfjorden, Sulafjorden, Romsdalsfjorden and Halsafjorden – are in the county of Møre og Romsdal. The work is in addition to a 12-year environmental measurement programme relating to the major route, won by Fugro in 2016.

The geophysical and geotechnical data acquired by Fugro will help inform foundation designs of the bridge and tunnel solutions for the fjord crossings along the coastal route. Above and below sea level tunnels; an end-anchored floating bridge; a submerged floating tube bridge; and multi-span suspension bridge are amongst the innovative solutions being considered by NPRA to provide an improved E39 without ferries (currently seven ferries are used along the route). The new Coastal Highway will be almost 50km shorter and will cut in half the current journey time of around 21 hours.

Fugro’s work is split into two phases. Phase 1 encompasses geophysical mapping of the fjord-crossing areas and two vessels will be used to acquire geophysical and shallow geotechnical data. Survey vessel Fugro Helmert will cover shallow, nearshore areas to acquire multi-channel sparker data. From the second vessel Fugro will acquire detailed geophysical data in the deeper parts of the fjords using a remotely operated vehicle (ROV) and will also undertake seabed sampling and cone penetration testing.

With a planned start date of August 2018, phase 2 will see Fugro perform geotechnical drilling at selected locations as defined by the geophysical data acquired in the first phase. For deeper geotechnical drilling during phase 2, the high-tech drillship Fugro Synergy will be introduced.

“We started working with NPRA on the E39 Coastal Highway project last summer with a long-term programme to measure wind profiles, ocean waves and current profiles at three fjords,” explained Dag Sigurd Stensholt, Fugro’s business development manager in Norway. “It makes us very proud to add our marine site characterisation services to such a huge and important venture.”

For more information on companies in this article

Related Content

  • Thirst for Infrastructure: The Belt & Road Initiative
    November 8, 2017
    Susanna Zammataro, IRF Geneva, writes: The China Highway and Transportation Society (CHTS) – an esteemed member of IRF – will be hosting a special Session on the Belt and Road Initiative during the IRF World Meeting in Delhi, 14th-17th November 2017. Last May, president Xi Jinping welcomed 28 heads of state and government to Beijing to celebrate the “Belt and Road” initiative, an ambitious plan in terms of infrastructure development, but also in terms of foreign policy. Launched in 2013 as “One belt, On
  • Fast-track Biloxi Bay bridge
    July 18, 2012
    Construction of a bridge destroyed in a hurricane was completed early, and with some added aesthetic benefits Hurricane Katrina, one of the deadliest and costliest natural disasters in US history, made landfall on 29 August, 2005, devastating the Gulf Coast. The US 90 Bridge over Biloxi Bay (connecting the communities of Biloxi and Ocean Springs, Mississippi) was one of many major highway and railroad bridges knocked out of service due to extensive storm damage. The eye of the storm passed 96km west of Bilo
  • Cross Fraser Partnership wins BC tunnel work
    September 27, 2024
    The partnership for the tunnel work near Vancouver in Canada consists of Pomerleau BC, Bouygues Construction Canada and Fomento de Construcciones y Contratas Canada (FCC) and is supported by design and engineering consultant Arcadis.
  • Giatec promises Smart Concrete
    April 27, 2018
    Giatec’s Smart Concrete concept allows ready mix concrete suppliers to offer optimised mixes to their customers – and to charge more for them. Giatec, which makes concrete sensors and associated software and apps, works with the concrete producers to calibrate their mixes. The concrete company then supplies Giatec’s maturity monitoring sensors as part of the concrete package. “The ready mix suppliers get information straight away so that they can adjust their mixes if necessary,” says Giatec business